Barataria Bay Waterway, Maintenance Dredging (Non-Continuous) Bayou Rigaud, Jefferson Parish, Louisiana (ED-25-008)
Summary
Barataria Bay Waterway, Maintenance Dredging (Non-Continuous) Bayou Rigaud, Jefferson Parish, Louisiana (ED-25-008) The work consists of removal of all material excavated from the limits of Bayou Rigaud Channel, and satisfactory disposal thereof within the Government furnished disposal area shown and associated retention dike work as specified herein and shown on the Contract Drawings. (The estimated time of completion is 100 calendar days after receipt of Notice to Proceed. The solicitation will include 13 drawings and specifications). The magnitude of construction range for this dredge project is between $5,000,000 and $10,000,000. BID OPENING WILL BE SCHEDULED BY AMENDMENT
Details
| Solicitation Number | W912P826BA073 |
| Type | Solicitation |
| Posted | 2026-08-17 2:27PM EDT (2 months ago) |
| Response Deadline | 2028-08-16 8:00PM EDT (in 1 year) |
| NAICS Code | 237990 |
| City | NEW ORLEANS |
| State | LA |
| ZIP | 70118-3651 |
Description
Barataria Bay Waterway, Maintenance Dredging (Non-Continuous) Bayou Rigaud, Jefferson Parish, Louisiana (ED-25-008) The work consists of removal of all material excavated from the limits of Bayou Rigaud Channel, and satisfactory disposal thereof within the Government furnished disposal area shown and associated retention dike work as specified herein and shown on the Contract Drawings. (The estimated time of completion is 100 calendar days after receipt of Notice to Proceed. The solicitation will include 13 drawings and specifications). The magnitude of construction range for this dredge project is between $5,000,000 and $10,000,000. BID OPENING WILL BE SCHEDULED BY AMENDMENT
Contact
| Name | Leann Thornton |
| Email / phone | 🔒 Available with Pro Upgrade |