Lift Station 3 Rehabilition
Summary
The Town of Lantana Lift Station No. 3 Rehabilitation project is to furnish all labor, equipment, materials, and performing all operations for the rehabilitation of Lift Station No. 3. The project includes converting the existing dry pit lift station to a submersible lift station by rehabilitating the existing wet well, demolition of the existing dry pit, replacement of pumps and associated wet well and valve vault piping, installation of a new top slab and access hatch, RTU modifications, and electrical control panel and associated electrical conduit and wiring replacement. The station is located at 320 E Ocean Avenue.
MANDATORY A mandatory pre-bid meeting and site inspection will be held on Tuesday, November 17, 2026, at 10:00 A.M., at Town of Lantana, Town Hall, 500 Greynolds Circle, Lantana, FL 33462.
Details
| Solicitation Number | ITB-ITB 2024-07-PS-0-2026/JD |
| Type | ITB |
| Posted | 2026-11-08 7:00AM EST (1 day ago) |
| Response Deadline | 2026-12-10 2:00PM EST (in 1 month) |
| City | Lantana |
| State | FL |
Description
The Town of Lantana Lift Station No. 3 Rehabilitation project is to furnish all labor, equipment, materials, and performing all operations for the rehabilitation of Lift Station No. 3. The project includes converting the existing dry pit lift station to a submersible lift station by rehabilitating the existing wet well, demolition of the existing dry pit, replacement of pumps and associated wet well and valve vault piping, installation of a new top slab and access hatch, RTU modifications, and electrical control panel and associated electrical conduit and wiring replacement. The station is located at 320 E Ocean Avenue.
MANDATORY A mandatory pre-bid meeting and site inspection will be held on Tuesday, November 17, 2026, at 10:00 A.M., at Town of Lantana, Town Hall, 500 Greynolds Circle, Lantana, FL 33462.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |