Public Works Storage Building
Summary
The Work consists of obtaining all building permits and furnishing all labor, equipment, and materials to construct a pre-engineered metal building (PEMB) and associated site improvements, including but not limited to the following: 1. Erosion and sediment control 2. Site clearing 3. Rough grading 4. Foundation 5. PEMB along with: a. (4) Motorized overhead doors b. R-19 bag & batt insulation c. (2) HVLS & exhaust fans d. Interior and exterior lighting e. Electrical power and control systems f. Fire alarm system g. Rough-in for Owner-furnished security systems 6. Paving 7. Drainage 8. Final grading 9. Sodding The scope is further defined and detailed within the Plans, Technical Specifications, and General Conditions associated with this project. The CONTRACTOR is responsible for reviewing all documentation associated with this project. All work shall conform to applicable federal, state, county, and District regulations, standards, and specifications.
NON-MANDATORY There will be a non-mandatory pre-bid meeting held in the Board Chambers on Thursday, November 12th, 2026, at 12 PM at 11137 Gateway Blvd., Fort Myers, FL 33913 or join online via: tinyurl.com/PrebidITB-27-02-PW.
Details
| Solicitation Number | RFP-ITB-27-02-PW-0-2027/CR |
| Type | RFP |
| Posted | 2026-11-07 8:00AM EST (2 days ago) |
| Response Deadline | 2026-12-21 2:00PM EST (in 1 month) |
| City | Fort Myers |
| State | FL |
Description
The Work consists of obtaining all building permits and furnishing all labor, equipment, and materials to construct a pre-engineered metal building (PEMB) and associated site improvements, including but not limited to the following: 1. Erosion and sediment control 2. Site clearing 3. Rough grading 4. Foundation 5. PEMB along with: a. (4) Motorized overhead doors b. R-19 bag & batt insulation c. (2) HVLS & exhaust fans d. Interior and exterior lighting e. Electrical power and control systems f. Fire alarm system g. Rough-in for Owner-furnished security systems 6. Paving 7. Drainage 8. Final grading 9. Sodding The scope is further defined and detailed within the Plans, Technical Specifications, and General Conditions associated with this project. The CONTRACTOR is responsible for reviewing all documentation associated with this project. All work shall conform to applicable federal, state, county, and District regulations, standards, and specifications.
NON-MANDATORY There will be a non-mandatory pre-bid meeting held in the Board Chambers on Thursday, November 12th, 2026, at 12 PM at 11137 Gateway Blvd., Fort Myers, FL 33913 or join online via: tinyurl.com/PrebidITB-27-02-PW.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |