Fine Arts Instructional Center Boiler Replacement
Summary
Project Description: The work involves the installation of three highly efficient natural gas condensing type hot water boilers including boiler pumps, all associated piping, power wiring and controls. Summary of Work includes but is not limited to the following: 1. Removal and disposal of the existing natural gas boiler(s). 2. Removal and disposal of existing combustion air, flue vent and hydronic piping. 3. Infilling of existing unused masonry wall penetrations. 4. Creation of new masonry wall penetrations. 5. Installing new high efficiency natural gas hot water boilers. 6. Connecting new boilers to existing natural gas piping. 7. Installing new combustion air, flue vent and hydronic piping. 8. New power and controls wiring and raceway. 9. Testing and startup of new equipment and devices.
Details
| Solicitation Number | ECSU 2027-203 |
| Type | ITB |
| Posted | 2026-11-06 9:00AM EST (3 days ago) |
| Response Deadline | 2026-12-04 2:00PM EST (in 24 days) |
| State | CT |
Description
Project Description: The work involves the installation of three highly efficient natural gas condensing type hot water boilers including boiler pumps, all associated piping, power wiring and controls. Summary of Work includes but is not limited to the following: 1. Removal and disposal of the existing natural gas boiler(s). 2. Removal and disposal of existing combustion air, flue vent and hydronic piping. 3. Infilling of existing unused masonry wall penetrations. 4. Creation of new masonry wall penetrations. 5. Installing new high efficiency natural gas hot water boilers. 6. Connecting new boilers to existing natural gas piping. 7. Installing new combustion air, flue vent and hydronic piping. 8. New power and controls wiring and raceway. 9. Testing and startup of new equipment and devices.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
๐ 6. ADMINISTRATIVE OVERVIEW BID updated use this template.docx DocumentationAdministrative Overview