Fine Arts Instructional Center Boiler Replacement

Agency: Eastern Connecticut State University Solicitation #: ECSU 2027-203 Due: 2026-12-04 2:00PM EST (in 24 days)
Open Bonfire

Summary

Project Description: The work involves the installation of three highly efficient natural gas condensing type hot water boilers including boiler pumps, all associated piping, power wiring and controls. Summary of Work includes but is not limited to the following: 1. Removal and disposal of the existing natural gas boiler(s). 2. Removal and disposal of existing combustion air, flue vent and hydronic piping. 3. Infilling of existing unused masonry wall penetrations. 4. Creation of new masonry wall penetrations. 5. Installing new high efficiency natural gas hot water boilers. 6. Connecting new boilers to existing natural gas piping. 7. Installing new combustion air, flue vent and hydronic piping. 8. New power and controls wiring and raceway. 9. Testing and startup of new equipment and devices.

Details

Solicitation NumberECSU 2027-203
TypeITB
Posted2026-11-06 9:00AM EST (3 days ago)
Response Deadline2026-12-04 2:00PM EST (in 24 days)
StateCT

Description

Project Description: The work involves the installation of three highly efficient natural gas condensing type hot water boilers including boiler pumps, all associated piping, power wiring and controls. Summary of Work includes but is not limited to the following: 1. Removal and disposal of the existing natural gas boiler(s). 2. Removal and disposal of existing combustion air, flue vent and hydronic piping. 3. Infilling of existing unused masonry wall penetrations. 4. Creation of new masonry wall penetrations. 5. Installing new high efficiency natural gas hot water boilers. 6. Connecting new boilers to existing natural gas piping. 7. Installing new combustion air, flue vent and hydronic piping. 8. New power and controls wiring and raceway. 9. Testing and startup of new equipment and devices.

Contact

Email / phone 🔒 Available with Pro Upgrade

Documents