Helicopter Weapon Recover System
Yes
Federal
Summary
Amendment 01: The purpose of this amendment is to post question and answer. All terms and conditions remain unchanged: Those drawings are not a part of the build request. Those are ancillary parts to the main structure (barrel, landing frame, strongback). Were requesting only to machine, weld, and assemble the barrel, landing frame, and strongback. Hardware will be required to assemble these which we are asking for purchase of hardware and assembly of all components. Question: I think the drawing package is missing some drawings. I can't find Drawing 3180818 Skirt Assembly. Drawing 5014208, 6146374 and 5979904-1 are missing too. Answer: Those drawings are not a part of the build request. Those are ancillary parts to the main structure (barrel, landing frame, strongback). Were requesting only to machine, weld, and assemble the barrel, landing frame, and strongback. Hardware will be required to assemble these which we are asking for purchase of hardware and assembly of all components. See attachments for details on this opportunity.
Details
| Solicitation Number | N6660427Q0026 |
| Type | Combined Synopsis/Solicitation |
| Posted | 2026-11-06 6:42AM EST (3 days ago) |
| Response Deadline | 2026-11-09 9:00PM EST (in 12 hours) |
| NAICS Code | 336413 |
| City | NEWPORT |
| State | RI |
| ZIP | 02841-1703 |
Description
Amendment 01: The purpose of this amendment is to post question and answer. All terms and conditions remain unchanged: Those drawings are not a part of the build request. Those are ancillary parts to the main structure (barrel, landing frame, strongback). Were requesting only to machine, weld, and assemble the barrel, landing frame, and strongback. Hardware will be required to assemble these which we are asking for purchase of hardware and assembly of all components. Question: I think the drawing package is missing some drawings. I can't find Drawing 3180818 Skirt Assembly. Drawing 5014208, 6146374 and 5979904-1 are missing too. Answer: Those drawings are not a part of the build request. Those are ancillary parts to the main structure (barrel, landing frame, strongback). Were requesting only to machine, weld, and assemble the barrel, landing frame, and strongback. Hardware will be required to assemble these which we are asking for purchase of hardware and assembly of all components. See attachments for details on this opportunity.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |