Tunnel 9 Pitch Upgrade

Agency: DEPT OF DEFENSE Location: ARNOLD AFB, TN Solicitation #: FA9101T9PU Due: 2026-12-10 5:00AM EST (in 1 month)
Yes Federal

Summary

The Arnold Engineering Development Complex (AEDC) Tunnel 9, located in Silver Spring, MD, requires the comprehensive modernization of a high-performance hydraulic motion system. The scope of this Firm Fixed-Price (FFP) requirement includes the design, engineering, procurement, off-site fabrication, pre assembly, on-site demolition, installation, and commissioning of core system components. All components must comply with ASME B31.1, ASME BPVC VIII, and ISO 4406 standards. Core components include: • Primary control valve (step response time of 55 ms or less) • Main actuating cylinder (working stroke of 120.5” capable of achieving a linear speed of 13 ft/s) • Hydraulic Power Unit (HPU) • Dedicated filtration and cooling "kidney" loop.

Details

Solicitation NumberFA9101T9PU
TypeSolicitation
Posted2026-11-06 11:30AM EST (3 days ago)
Response Deadline2026-12-10 5:00AM EST (in 1 month)
NAICS Code332912
CityARNOLD AFB
StateTN
ZIP37389-1332

Description

The Arnold Engineering Development Complex (AEDC) Tunnel 9, located in Silver Spring, MD, requires the comprehensive modernization of a high-performance hydraulic motion system. The scope of this Firm Fixed-Price (FFP) requirement includes the design, engineering, procurement, off-site fabrication, pre assembly, on-site demolition, installation, and commissioning of core system components. All components must comply with ASME B31.1, ASME BPVC VIII, and ISO 4406 standards. Core components include: • Primary control valve (step response time of 55 ms or less) • Main actuating cylinder (working stroke of 120.5” capable of achieving a linear speed of 13 ft/s) • Hydraulic Power Unit (HPU) • Dedicated filtration and cooling "kidney" loop.

Contact

Email / phone 🔒 Available with Pro Upgrade