USCG Station Eaton's Neck Boiler Combustion Analysis and calibration

Agency: HOMELAND SECURITY, DEPARTMENT OF Location: Boston, MA Solicitation #: 70Z02427QBOST001 Due: 2026-11-13 8:00AM EST (in 3 days)
Yes Federal

Summary

THE TIMELINE FOR VISIT WILL BE 11/3/26-11/6/2026, 11/9/2026-11/10/2026 8AM- 3PM EST. SITE VISITS: MUST BE COORDINATED WITH DC1 MICHAEL BUSH VIA PHONE 934-235-0487. This project consists of combustion analysis, calibration, and commissioning services for eleven (11) boilers at the U.S. Coast Guard housing area at Station Eaton’s Neck.(12 Lighthouse Rd, Northport, NY 11768) Each housing unit contains the following equipment covered under this agreement: Boiler: Weil-McLain EVG 299 (280,000 BTU) Hot Water Storage Tank: Weil-McLain AQUA PLUS – 55 – S2 The purpose of this requirement is to verify and adjust boiler combustion settings in accordance with applicable manufacturer specifications; support safe, efficient, and reliable boiler operation; and document any equipment conditions requiring work beyond the scope of combustion calibration and commissioning.

Details

Solicitation Number70Z02427QBOST001
TypeCombined Synopsis/Solicitation
Posted2026-11-05 8:57AM EST (4 days ago)
Response Deadline2026-11-13 8:00AM EST (in 3 days)
NAICS Code238220
CityBoston
StateMA
ZIP02109

Description

THE TIMELINE FOR VISIT WILL BE 11/3/26-11/6/2026, 11/9/2026-11/10/2026 8AM- 3PM EST. SITE VISITS: MUST BE COORDINATED WITH DC1 MICHAEL BUSH VIA PHONE 934-235-0487. This project consists of combustion analysis, calibration, and commissioning services for eleven (11) boilers at the U.S. Coast Guard housing area at Station Eaton’s Neck.(12 Lighthouse Rd, Northport, NY 11768) Each housing unit contains the following equipment covered under this agreement: Boiler: Weil-McLain EVG 299 (280,000 BTU) Hot Water Storage Tank: Weil-McLain AQUA PLUS – 55 – S2 The purpose of this requirement is to verify and adjust boiler combustion settings in accordance with applicable manufacturer specifications; support safe, efficient, and reliable boiler operation; and document any equipment conditions requiring work beyond the scope of combustion calibration and commissioning.

Contact

Email / phone 🔒 Available with Pro Upgrade