5064(078) Holly Street Bridge Seismic Retrofit & Rehabilitation Project (HBP) [CIP No. 73323]

Agency: City of Pasadena Location: Pasadena, CA Solicitation #: 2026-IFB-CIV-0063 Due: 2026-12-03 5:00PM EST (in 23 days)
open Opengov

Summary

The City of Pasadena, in coordination with the California Department of Transportation (Caltrans), proposes to rehabilitate and seismically retrofit the existing two-lane Holly Street Bridge (No. 53C1041) over the Arroyo Seco Channel, the Arroyo Seco Trail (a Class 1 multi-use trail), and North Arroyo Boulevard.

The project includes seismic retrofit and comprehensive bridge rehabilitation work including deck treatment, repair of spalled concrete, and rehabilitation of bridge girders with exposed reinforcing steel to address identified structural deficiencies and extend the service life of the facility. In addition, the project includes upgrades to bring adjacent pedestrian facilities (sidewalk, curb and gutter, and new curb ramps) into compliance with current Americans with Disabilities Act (ADA) standards, specifically at the intersection of Linda Vista Avenue and Holly Street.

The project is funded by the Federal Highway Administration (FHWA) through the Highway Bridge Program (HBP), authorized by United States Code (U.S.C.) Title 23 and administered by Caltrans. The Contractor is required to comply with all applicable federal, state, and local laws, regulations, and requirements associated with federally funded projects.

Details

Solicitation Number2026-IFB-CIV-0063
TypeActive
Posted2026-11-05 11:44AM EST (4 days ago)
Response Deadline2026-12-03 5:00PM EST (in 23 days)
CityPasadena
StateCA
ZIP91101

Description

The City of Pasadena, in coordination with the California Department of Transportation (Caltrans), proposes to rehabilitate and seismically retrofit the existing two-lane Holly Street Bridge (No. 53C1041) over the Arroyo Seco Channel, the Arroyo Seco Trail (a Class 1 multi-use trail), and North Arroyo Boulevard.

The project includes seismic retrofit and comprehensive bridge rehabilitation work including deck treatment, repair of spalled concrete, and rehabilitation of bridge girders with exposed reinforcing steel to address identified structural deficiencies and extend the service life of the facility. In addition, the project includes upgrades to bring adjacent pedestrian facilities (sidewalk, curb and gutter, and new curb ramps) into compliance with current Americans with Disabilities Act (ADA) standards, specifically at the intersection of Linda Vista Avenue and Holly Street.

The project is funded by the Federal Highway Administration (FHWA) through the Highway Bridge Program (HBP), authorized by United States Code (U.S.C.) Title 23 and administered by Caltrans. The Contractor is required to comply with all applicable federal, state, and local laws, regulations, and requirements associated with federally funded projects.

Contact

NameAntonio Watson
Email / phone 🔒 Available with Pro Upgrade
View on City of Pasadena →