Lower Level Buildout Assessment for Malcolm X College
Summary
Admin Services is requesting the release of a letter of interest to engage and architect and engineer for the potential build-out in the lower level of MXC. Architectural and engineering services as required to determine the feasibility and cost of converting a portion of the existing storage space in the MXC basement into occupiable space.
Details
| Solicitation Number | LOI-NG2611 |
| Type | Other |
| Posted | 2026-11-04 3:00PM EST (5 days ago) |
| Response Deadline | 2026-12-14 1:00PM EST (in 1 month) |
| State | IL |
Description
Admin Services is requesting the release of a letter of interest to engage and architect and engineer for the potential build-out in the lower level of MXC. Architectural and engineering services as required to determine the feasibility and cost of converting a portion of the existing storage space in the MXC basement into occupiable space.
Contact
| Name | Nick Gibb |
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
๐ LOI-NG2611 - MXC Lower Level Assessment - FINAL.pdf DocumentationThere was an error at release. This is the CORRECT document