CONTROL BUILDING CHILLER REPLACEMENT (REBID)

Agency: Bergen County, NJ Solicitation #: BCUA -26-C214-R3 Due: 2026-11-19 12:00PM EST (in 9 days)
Open Bonfire

Summary

BCUA CONTRACT NO. C214: 1.Installation of the new six (6) section modular chiller that has been pre- purchased by the Owner in accordance with the construction documents and all manufacturer requirements. 2. Installation of a new refrigerant detection and exhaust system specific for the existing and new refrigerants in use at the facility. 3. The refurbishment of the two (2) existing cooling tower cells by a manufacturer approved restoration company. 4. All related and ancillary work including piping, duct work, supports, controls, etc. as required for a complete and fully operational plant. A walk through is not required but is STRONGLY RECCOMENDED. All requests must be submitted no later than 24 hours notice to mtansey@bcua.org. All visitors must arrive with their own hard hats and PPE equipment.

Details

Solicitation NumberBCUA -26-C214-R3
TypeRFB
Posted2026-11-04 5:00PM EST (5 days ago)
Response Deadline2026-11-19 12:00PM EST (in 9 days)
StateNJ

Description

BCUA CONTRACT NO. C214: 1.Installation of the new six (6) section modular chiller that has been pre- purchased by the Owner in accordance with the construction documents and all manufacturer requirements. 2. Installation of a new refrigerant detection and exhaust system specific for the existing and new refrigerants in use at the facility. 3. The refurbishment of the two (2) existing cooling tower cells by a manufacturer approved restoration company. 4. All related and ancillary work including piping, duct work, supports, controls, etc. as required for a complete and fully operational plant. A walk through is not required but is STRONGLY RECCOMENDED. All requests must be submitted no later than 24 hours notice to mtansey@bcua.org. All visitors must arrive with their own hard hats and PPE equipment.

Contact

Email / phone 🔒 Available with Pro Upgrade