ANMC Clean Steam Generator Replacement

Agency: Alaska Native Tribal Health Consortium Solicitation #: 27-B-13906 Due: 2026-11-27 7:00PM EST (in 17 days)
Open Bonfire

Summary

This project is for the replacement of the clean steam generation system. Work includes phased demolition of the steam-to-steam heat exchanger, clean steam feedwater storage tank, feedwater pumps and associated plant and clean steam and condensate piping. New steam-to-steam heat exchangers for an N+1 system, feedwater storage tank, feedwater pumps, and reverse osmosis system will be installed. Additional work outside of the boiler room will involve removing the existing Sanipak from the clean steam system and refeeding the sterile processing depart with new stainless-steel piping. Integration with the existing Building Automation System will be required using Siemens Desigo user interface. Areas of work are confined to the basement and level 3 mechanical room.

Details

Solicitation Number27-B-13906
TypeIFB
Posted2026-11-04 4:00PM EST (5 days ago)
Response Deadline2026-11-27 7:00PM EST (in 17 days)
StateAK

Description

This project is for the replacement of the clean steam generation system. Work includes phased demolition of the steam-to-steam heat exchanger, clean steam feedwater storage tank, feedwater pumps and associated plant and clean steam and condensate piping. New steam-to-steam heat exchangers for an N+1 system, feedwater storage tank, feedwater pumps, and reverse osmosis system will be installed. Additional work outside of the boiler room will involve removing the existing Sanipak from the clean steam system and refeeding the sterile processing depart with new stainless-steel piping. Integration with the existing Building Automation System will be required using Siemens Desigo user interface. Areas of work are confined to the basement and level 3 mechanical room.

Contact

Email / phone 🔒 Available with Pro Upgrade