AM27-125 Upper Sevier River Rock – 2026

Agency: State of Utah Solicitation #: AM27-125 Due: 2026-11-25 4:00PM EST (in 15 days)
Open Bonfire

Summary

Issuing Procurement Unit: State of Utah Division of Purchasing Conducting Procurement Unit: Division of Wildlife Resources The purpose of this IFB is to enter into a contract to provide: to load, haul, and dump 630 cubic yards of 3-5 feet diameter rock in Garfield County. Mandatory Site Visit: November 18th, 2026 at 10:00 am at the Losee Canyon turn off from SR-12 (37°44'43.6"N 112°20'30.4"W) https://maps.app.goo.gl/m3y7nt7Zhq6LNhPw9 It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor. The methodology or formula that will be used to determine the number of contract awards is: Lowest Cost. Vendor must guarantee its pricing for duration of the project.

Details

Solicitation NumberAM27-125
TypeIFB
Posted2026-11-04 4:00PM EST (5 days ago)
Response Deadline2026-11-25 4:00PM EST (in 15 days)
StateUT

Description

Issuing Procurement Unit: State of Utah Division of Purchasing Conducting Procurement Unit: Division of Wildlife Resources The purpose of this IFB is to enter into a contract to provide: to load, haul, and dump 630 cubic yards of 3-5 feet diameter rock in Garfield County. Mandatory Site Visit: November 18th, 2026 at 10:00 am at the Losee Canyon turn off from SR-12 (37°44'43.6"N 112°20'30.4"W) https://maps.app.goo.gl/m3y7nt7Zhq6LNhPw9 It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor. The methodology or formula that will be used to determine the number of contract awards is: Lowest Cost. Vendor must guarantee its pricing for duration of the project.

Contact

NameAlbert Mosley
Email / phone 🔒 Available with Pro Upgrade