College Station - James-Puryear & Francis Drive (GMP#2)
Generic-bids
Summary
The project includes a multi-component public infrastructure and park improvement project. Phase 2 (GMP#2) of this project includes: the redevelopment of James Parkway, Puryear Drive, and Francis Drive. - Scope includes (but is not limited to): demolition, milling of existing asphalt, earthwork, subgrade stabilization, SWPPP, traffic control, tree protection, Water/Sanitary/Storm utilities & infrastructure upgrades, concrete paving, concrete curbs, concrete sidewalks, concrete driveways, stamped colored concrete, gravel driveways, asphalt transitions, paving sealants, pavement markings, signage, mailboxes, street lighting & power modifications, landscape/hardscape/irrigation repairs.
Details
| Solicitation Number | GMP2 |
| Type | agency-site |
| Posted | 2026-11-03 1:00AM EST (6 days ago) |
| Response Deadline | 2026-12-03 1:00AM EST (in 23 days) |
| State | TX |
Description
The project includes a multi-component public infrastructure and park improvement project. Phase 2 (GMP#2) of this project includes: the redevelopment of James Parkway, Puryear Drive, and Francis Drive. - Scope includes (but is not limited to): demolition, milling of existing asphalt, earthwork, subgrade stabilization, SWPPP, traffic control, tree protection, Water/Sanitary/Storm utilities & infrastructure upgrades, concrete paving, concrete curbs, concrete sidewalks, concrete driveways, stamped colored concrete, gravel driveways, asphalt transitions, paving sealants, pavement markings, signage, mailboxes, street lighting & power modifications, landscape/hardscape/irrigation repairs.
Contact
| Name | Brandi Whittenton |
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
๐ ESBD_573184_1793739432338_Notification.pdfITB notification of GMP #2