Alton Driver Relief Facility (Rebid)

Agency: Madison County Transit / Agency for Community Transit Solicitation #: 26-1-24600R1 Due: 2026-12-03 3:00PM EST (in 23 days)
Open Bonfire

Summary

Firms are invited to submit a sealed bid for the Alton Driver Relief Facility project. This is a rebid of a cancelled procurement. This federally funded project is located at 600 Piasa St., Alton, IL 62002. Construction includes an 872- square-foot building addition featuring a driver lounge, kitchenette, mechanical/storage room, and circulation space. The addition will be connected to an existing 785-square-foot building containing two restrooms and a mechanical room and will be constructed to match the existing structure with block CMU walls, brick veneer, cast stone banding and sills, glass block windows, and cast stone wall caps, with a slate roof over light-gauge metal trusses. Site improvements will include new parking stalls along a brick retaining wall, modifications to the existing concrete and brick patio, and a new concrete ramp. The scope also includes new access control and video surveillance for the new addition and adjacent bus station structure, requiring modifications to the existing mechanical space, as well as the construction of an outdoor mechanical enclosure to house HVAC equipment, together with all incidental and collateral work necessary to complete the project in accordance with the plans and specifications.

Details

Solicitation Number26-1-24600R1
TypeIFB
Posted2026-11-03 6:00PM EST (6 days ago)
Response Deadline2026-12-03 3:00PM EST (in 23 days)
StateIL

Description

Firms are invited to submit a sealed bid for the Alton Driver Relief Facility project. This is a rebid of a cancelled procurement. This federally funded project is located at 600 Piasa St., Alton, IL 62002. Construction includes an 872- square-foot building addition featuring a driver lounge, kitchenette, mechanical/storage room, and circulation space. The addition will be connected to an existing 785-square-foot building containing two restrooms and a mechanical room and will be constructed to match the existing structure with block CMU walls, brick veneer, cast stone banding and sills, glass block windows, and cast stone wall caps, with a slate roof over light-gauge metal trusses. Site improvements will include new parking stalls along a brick retaining wall, modifications to the existing concrete and brick patio, and a new concrete ramp. The scope also includes new access control and video surveillance for the new addition and adjacent bus station structure, requiring modifications to the existing mechanical space, as well as the construction of an outdoor mechanical enclosure to house HVAC equipment, together with all incidental and collateral work necessary to complete the project in accordance with the plans and specifications.

Contact

Email / phone 🔒 Available with Pro Upgrade

Documents