BID 2026-79 Tri-City WRRF Boiler Gas Feed
Summary
The Work of this Contract is defined through the Bid Solicitation Documents, notably the Specifications and Drawings. It generally includes the modification of existing stainless-steel digester gas piping at Tri-City WRRF to create new piping connections. These will allow combustible gas produced by the anaerobic digesters to flow through existing gas conditioning units prior to fueling boilers. Contractor will purge gas lines, demolish sections of existing 6-inch and 8-inch stainless-steel gas
Details
| Solicitation Number | S-C01010-00018330 |
| Type | OPEN |
| Posted | 2026-11-03 3:25PM EST (6 days ago) |
| Response Deadline | 2026-12-03 5:00PM EST (in 23 days) |
| State | OR |
Description
The Work of this Contract is defined through the Bid Solicitation Documents, notably the Specifications and Drawings. It generally includes the modification of existing stainless-steel digester gas piping at Tri-City WRRF to create new piping connections. These will allow combustible gas produced by the anaerobic digesters to flow through existing gas conditioning units prior to fueling boilers. Contractor will purge gas lines, demolish sections of existing 6-inch and 8-inch stainless-steel gas
Contact
| Name | Juliana Snegireff |
| Email / phone | 🔒 Available with Pro Upgrade |