2027 Task Order Contract for Street Rehabilitation Package 9 – Reconstruction
Generic-bids
Summary
Construction may include but is not limited to:Street Reconstruction, base and pavement replacement, cleaning and sealingjoints and cracks, curb ramps, concrete curbs, sidewalks, driveways, concreteretaining walls-combination type, speed humps, topsoil, sodding, signage,pavement markings installation, adjusting existing valve boxes and manholes,and any other items required due to the site conditions to accomplish theproject scope.
Details
| Solicitation Number | 23-04203-09 |
| Type | agency-site |
| Posted | 2026-11-02 1:00AM EST (8 days ago) |
| Response Deadline | 2026-12-15 1:00AM EST (in 1 month) |
| State | TX |
Description
Construction may include but is not limited to:Street Reconstruction, base and pavement replacement, cleaning and sealingjoints and cracks, curb ramps, concrete curbs, sidewalks, driveways, concreteretaining walls-combination type, speed humps, topsoil, sodding, signage,pavement markings installation, adjusting existing valve boxes and manholes,and any other items required due to the site conditions to accomplish theproject scope.
Contact
| Name | Sandra Figueroa |
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
📄 ESBD_573068_1793654763322_23-04203-09 Solicitation Synopsis.pdfSolicitation Synopsis