BWA - RFQ -Reinstatement Ashbury
Open
Bonfire
Summary
The Barbados Water Authority is desirous of obtaining quotations for the reinstatement of the roadway following the installation of new water mains in Golden Ridge Village and Ashbury (Highway 3B) , St. George. The full scope of works involved in said reinstatement includes: Site inspection to confirm proposed measurements Saw-cut edges of asphalt roadway adjacent to trench prior to reinstatement Re-excavation of the first 12 inches (1’) of pipe trench in preparation for carriageway reinstatement and cart away. Backfilling of the excavated 12 inches and compaction to 98 % proctor compaction with 50 mm crusher run, or marl fill as per the specifications of the Ministry of Transport and Works. Reinstate carriageway with hot mix asphalt, minimum 25 mm thickness or equivalent to existing carriageway as confirmed via site inspection or in accordance with MTW specifications for the respective carriageway class; whichever is thicker. Details The approximate areas to be reinstated: 1. Golden Ridge Village – 1,375 ft x 3 ft 2. Ashbury Highway 3B – 660 ft x 5 ft
Details
| Solicitation Number | BWA-2026-0355 |
| Type | RFQ |
| Posted | 2026-11-02 1:00PM EST (6 days ago) |
| Response Deadline | 2026-11-09 10:30PM EST (in 13 hours) |
| State | US |
Description
The Barbados Water Authority is desirous of obtaining quotations for the reinstatement of the roadway following the installation of new water mains in Golden Ridge Village and Ashbury (Highway 3B) , St. George. The full scope of works involved in said reinstatement includes: Site inspection to confirm proposed measurements Saw-cut edges of asphalt roadway adjacent to trench prior to reinstatement Re-excavation of the first 12 inches (1’) of pipe trench in preparation for carriageway reinstatement and cart away. Backfilling of the excavated 12 inches and compaction to 98 % proctor compaction with 50 mm crusher run, or marl fill as per the specifications of the Ministry of Transport and Works. Reinstate carriageway with hot mix asphalt, minimum 25 mm thickness or equivalent to existing carriageway as confirmed via site inspection or in accordance with MTW specifications for the respective carriageway class; whichever is thicker. Details The approximate areas to be reinstated: 1. Golden Ridge Village – 1,375 ft x 3 ft 2. Ashbury Highway 3B – 660 ft x 5 ft
Contact
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
📄 Government of Barbados Procurement Portal - Instructions to Vendor.pdf DocumentationGovernment of Barbados Procurement Portal - Instructions to Vendor
-
📄 Barbados Water Authority Know Your Supplier Form.docx DocumentationIn order to provide goods and or services to the Barbados Water Authority, your company will need to be added as a Vendor. Kindly complete the "Know Your Supplier Form" providing the W9, Certificate of Incorporation and VAT/ TAMIS certificate.
-
📄 Government of Barbados Procurement Portal - Requested Information.pdf DocumentationThe documents listed via this form should be provided along with your submission.
-
📄 APPLICANT BID SUBMISSION FORM - TENDER FOR THE SUPPLY TEMPLATE.docx DocumentationApplicant’s Bid Submission Form
-
📄 Certification of Compliance to Labour Clauses (Public Contracts) Act CAP.349.docx DocumentationCertification of Compliance to Labour Clauses
-
📄 MTW Specifications for reinstatements of small openings, crossings, tracks and signage.pdf DocumentationMTW Specification for reinstatement