Becks Run Road Slope Stabilization Sta 104+60

Agency: Allegheny County Solicitation #: 5024-0102 Due: 2026-11-18 11:30AM EST (in 8 days)
Open Bonfire

Summary

The work consists of the installation of two rows of vertically-aligned steel pipe dowels socketed into bedrock with reinforced concrete wall cast around the upper portion of the outside row of dowels, topped by a reinforced concrete cap cast atop both rows of dowels, to stabilize and support of a 151-foot length of Becks Run Road in the City of Pittsburgh, Allegheny County, PA. The scope of work also includes structure mounted guide rail attached to the concrete cap, roadway paving, and the installation of erosion and sedimentation control measures.

Details

Solicitation Number5024-0102
TypeITB
Posted2026-10-20 12:00PM EDT (20 days ago)
Response Deadline2026-11-18 11:30AM EST (in 8 days)
StatePA

Description

The work consists of the installation of two rows of vertically-aligned steel pipe dowels socketed into bedrock with reinforced concrete wall cast around the upper portion of the outside row of dowels, topped by a reinforced concrete cap cast atop both rows of dowels, to stabilize and support of a 151-foot length of Becks Run Road in the City of Pittsburgh, Allegheny County, PA. The scope of work also includes structure mounted guide rail attached to the concrete cap, roadway paving, and the installation of erosion and sedimentation control measures.

Contact

Email / phone 🔒 Available with Pro Upgrade

Documents