Wastewater Treatment Plant Masterplan Upgrades

Agency: City of Lakeland Location: Lakeland, FL Solicitation #: 2026-RFQ-134 Due: 2026-12-15 2:00PM EST (in 1 month)
open Opengov

Summary

The City of Lakeland is seeking to use the Progressive Design Build delivery method to provide needed upgrades and updates to the Glendale and Northside Wastewater Reclamation Facilities. The purpose of this RFQ is to select a Design-Build firm that can utilize existing information provided by the City and/or other sources, review current technology, and provide the most cost-efficient design and construction associated with preliminary and final designs, permitting, bidding, construction management.

The key goals of the project are the installation of a new solar drying facility or an equivalent recommended facility, replacement of the existing intermediate pump station located at the Glendale site, replacement or upgrades for equipment and systems as needed in the system, and to seek opportunity to increase plant capacity. The City of Lakeland is currently interested in solar drying from site visits to other plants but will consider other facilities that will achieve consistent class AA biosolids, with exception to composting.

This solicitation will follow the requirements of Florida Statute 287.055 termed the “Consultants’ Competitive Negotiations Act (CCNA)”. In compliance with the Florida Consultants’ Competitive Negotiation Act (CCNA), (Chapter 287), rates shall not be included in this proposal.

Details

Solicitation Number2026-RFQ-134
TypeActive
Posted2026-11-02 12:00AM EST (8 days ago)
Response Deadline2026-12-15 2:00PM EST (in 1 month)
CityLakeland
StateFL
ZIP33801

Description

The City of Lakeland is seeking to use the Progressive Design Build delivery method to provide needed upgrades and updates to the Glendale and Northside Wastewater Reclamation Facilities. The purpose of this RFQ is to select a Design-Build firm that can utilize existing information provided by the City and/or other sources, review current technology, and provide the most cost-efficient design and construction associated with preliminary and final designs, permitting, bidding, construction management.

The key goals of the project are the installation of a new solar drying facility or an equivalent recommended facility, replacement of the existing intermediate pump station located at the Glendale site, replacement or upgrades for equipment and systems as needed in the system, and to seek opportunity to increase plant capacity. The City of Lakeland is currently interested in solar drying from site visits to other plants but will consider other facilities that will achieve consistent class AA biosolids, with exception to composting.

This solicitation will follow the requirements of Florida Statute 287.055 termed the “Consultants’ Competitive Negotiations Act (CCNA)”. In compliance with the Florida Consultants’ Competitive Negotiation Act (CCNA), (Chapter 287), rates shall not be included in this proposal.

Contact

NameTara Walls
Email / phone 🔒 Available with Pro Upgrade