Cardozo Education Campus HVAC Upgrades
Summary
General work description:
This Project addresses system aging, operational deficiencies, and deferred maintenance through a targeted program of capital renewal and system optimization. The work includes replacement and
upgrades of select HVAC equipment, repairs to existing systems, enhancements to the building automation system (“BAS”) and controls, comprehensive preventive maintenance measures, and retro-commissioning to restore and verify system performance.
Details
| Solicitation Number | DCAM-22-CS-RFQ-0001 - RFTOP-CS-0179 |
| Type | Active |
| Posted | 2026-11-02 12:00AM EST (7 days ago) |
| Response Deadline | 2026-11-12 2:00PM EST (in 2 days) |
| City | Washington DC |
| State | DC |
| ZIP | 20019 |
Description
General work description:
This Project addresses system aging, operational deficiencies, and deferred maintenance through a targeted program of capital renewal and system optimization. The work includes replacement and
upgrades of select HVAC equipment, repairs to existing systems, enhancements to the building automation system (“BAS”) and controls, comprehensive preventive maintenance measures, and retro-commissioning to restore and verify system performance.
Contact
| Name | Peter Henry Lyonga |
| Email / phone | 🔒 Available with Pro Upgrade |