DPW2026-2 DREDGING OF STORM OUTFALL AT 160 WATER STREET
Summary
This project includes the dredging and proper upland disposal of approximately 200 cubic yards of accumulated sand and silt from the Total Marine boat launching area at the outlet of a 90” storm drain. In addition to the guidelines set forth in the Contract Specifications and Special Notes, the method of removal and disposal shall be in accordance with applications submitted by the City of Norwalk Department of Public Works to both the U.S. Army Corps of Engineers and the State of Connecticut Department of Energy and Environmental Protection. A copy of the approved permit is included in the Appendix. If the Contractor intends to use methods other than those outlined in the applications, it will be their responsibility to obtain approval from the respective agencies prior to the start of work. Weather permitting, the Contractor is required to commence work within 20 days of the issuance of Notice to Proceed. If inclement weather prohibits the practical performance of the required work, then commencement may occur at a later date, as approved by the City. All work must be completed within 30 days of project commencement, and in accordance with all requirements of the CT DEEP permit.
Details
| Solicitation Number | 4547 |
| Type | ITB |
| Posted | 2026-10-30 10:30AM EDT (10 days ago) |
| Response Deadline | 2026-11-19 2:00PM EST (in 9 days) |
| State | CT |
Description
This project includes the dredging and proper upland disposal of approximately 200 cubic yards of accumulated sand and silt from the Total Marine boat launching area at the outlet of a 90” storm drain. In addition to the guidelines set forth in the Contract Specifications and Special Notes, the method of removal and disposal shall be in accordance with applications submitted by the City of Norwalk Department of Public Works to both the U.S. Army Corps of Engineers and the State of Connecticut Department of Energy and Environmental Protection. A copy of the approved permit is included in the Appendix. If the Contractor intends to use methods other than those outlined in the applications, it will be their responsibility to obtain approval from the respective agencies prior to the start of work. Weather permitting, the Contractor is required to commence work within 20 days of the issuance of Notice to Proceed. If inclement weather prohibits the practical performance of the required work, then commencement may occur at a later date, as approved by the City. All work must be completed within 30 days of project commencement, and in accordance with all requirements of the CT DEEP permit.
Contact
| Name | Carleen Megaro |
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
📄 4547 DPW2026-2 Dredging of Storm Outfall at 160 Water Street Bid Package Final.pdf DocumentationInvitation to Bid