Repair Port Deposit I&I - Package 3
Summary
The purpose of this project is to eliminate stormwater and spring flow from entering the sanitary sewer by installing new storm drain piping and appurtenances in several locations along MD 222 in the Town of Port Deposit. There is also one section of sanitary sewer that will be replaced along Race Street.
Details
| Solicitation Number | IFB B-27-022-55078 |
| Type | Active |
| Posted | 2026-10-28 12:00AM EDT (13 days ago) |
| Response Deadline | 2026-12-10 12:00PM EST (in 1 month) |
| City | Elkton |
| State | MD |
| ZIP | 21921 |
Description
The purpose of this project is to eliminate stormwater and spring flow from entering the sanitary sewer by installing new storm drain piping and appurtenances in several locations along MD 222 in the Town of Port Deposit. There is also one section of sanitary sewer that will be replaced along Race Street.
Contact
| Name | Becky Boggs |
| Email / phone | 🔒 Available with Pro Upgrade |