San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Agency: West County Wastewater Location: Richmond, CA Solicitation #: 26-NIIB-052 Due: 2026-11-13 6:00PM EST (in 3 days)
open Opengov

Summary

The following scope of work is required to complete the San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation Project:

Provide all materials, equipment, and labor necessary to:

  • Install approximately 420 LF of 24’ CIPP Liner in the 24” ACP trunk sewer on San Pablo Dam Road from MHM17105 to MHM17106 
  • Provide Traffic control
  • Temporary Bypass/pumping
  • CCTV post-installation inspection video
  • Acquire Required Permits (see technical specifications section)
  • Complete construction installation work during night time when traffic and sewage flows are below average as determined by WCW 
  • Complete project within 30 Calendar days of NTP

Details

Solicitation Number26-NIIB-052
TypeActive
Posted2026-10-30 3:00AM EDT (11 days ago)
Response Deadline2026-11-13 6:00PM EST (in 3 days)
CityRichmond
StateCA
ZIP94806

Description

The following scope of work is required to complete the San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation Project:

Provide all materials, equipment, and labor necessary to:

  • Install approximately 420 LF of 24’ CIPP Liner in the 24” ACP trunk sewer on San Pablo Dam Road from MHM17105 to MHM17106 
  • Provide Traffic control
  • Temporary Bypass/pumping
  • CCTV post-installation inspection video
  • Acquire Required Permits (see technical specifications section)
  • Complete construction installation work during night time when traffic and sewage flows are below average as determined by WCW 
  • Complete project within 30 Calendar days of NTP

Contact

NameMaria Bagley
Email / phone 🔒 Available with Pro Upgrade