San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation
Summary
The following scope of work is required to complete the San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation Project:
Provide all materials, equipment, and labor necessary to:
- Install approximately 420 LF of 24’ CIPP Liner in the 24” ACP trunk sewer on San Pablo Dam Road from MHM17105 to MHM17106
- Provide Traffic control
- Temporary Bypass/pumping
- CCTV post-installation inspection video
- Acquire Required Permits (see technical specifications section)
- Complete construction installation work during night time when traffic and sewage flows are below average as determined by WCW
- Complete project within 30 Calendar days of NTP
Details
| Solicitation Number | 26-NIIB-052 |
| Type | Active |
| Posted | 2026-10-30 3:00AM EDT (11 days ago) |
| Response Deadline | 2026-11-13 6:00PM EST (in 3 days) |
| City | Richmond |
| State | CA |
| ZIP | 94806 |
Description
The following scope of work is required to complete the San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation Project:
Provide all materials, equipment, and labor necessary to:
- Install approximately 420 LF of 24’ CIPP Liner in the 24” ACP trunk sewer on San Pablo Dam Road from MHM17105 to MHM17106
- Provide Traffic control
- Temporary Bypass/pumping
- CCTV post-installation inspection video
- Acquire Required Permits (see technical specifications section)
- Complete construction installation work during night time when traffic and sewage flows are below average as determined by WCW
- Complete project within 30 Calendar days of NTP
Contact
| Name | Maria Bagley |
| Email / phone | 🔒 Available with Pro Upgrade |