RFQ 27-D-00003 43rd St. Pump Station Force Main Replacement Design
Summary
Public Announcement in Compliance With Requirements of Section 287.055 Florida Statutes (Consultants’ Competitive Negotiation Act) Applicable Law, Executive Orders, Rules, Regulations, and The City’s Standard Procedures. Notice of Intent to Award Shall be posted, if at all, on the City’s Website accessible by utilizing the website link: www.tampagov.net/contract-administration/programs/architectural-engineeringconstruction- and-related-rfqs . The City of Tampa Wastewater Department desires to obtain Design Services to complete the replacement of the 43rd St. Pump Station Force Main. Services will include, but not limited to, alternate route evaluation, survey, geotechnical services, final design, specifications, cost estimating, identifying subcontractor opportunities, Subsurface Utility Engineering (SUE), utility notification and coordination, easement acquisition as needed, permitting, public outreach, limited bid assistance, project management, limited construction engineering and inspection (CEI) services, as-built preparation and all related work required for a complete project. Background: The 43rd St. Pump Station Force Main was placed into service in 1983. The force main conveys wastewater from the 43rd St Pump Station located at 6524 N 43rd St to the Sulphur Springs PS 42" force main interconnection at Emma St and 25th St. The original pipeline consists of 16,423 LF of 24” Prestressed Cylinder Concrete (PCCP) pipe. The scope of the design will include, but not limited to: 1. Alternative route evaluation for the selection of the preferred location of the new force main 2. Complete design of selected alternative route 3. Complete permitting through all local, state, and federal agencies 4. Assistance with easement acquisition including survey (if needed) 5. Assistance with construction services including shop drawing reviews, responding to RFI’s, inspections 6. Preparation of As-builts and permit close-outs
NON-MANDATORY A pre-submission conference will be conducted at 3 PM November 16, 2026 in the City Council Chambers, third floor Old City Hall, 315 E. Kennedy Blvd. Tampa, FL 33602.
Details
| Solicitation Number | RFQ-27-D-00003-0-2027/AH |
| Type | RFQ |
| Posted | 2026-10-30 1:52PM EDT (10 days ago) |
| Response Deadline | 2026-12-03 2:00PM EST (in 23 days) |
| City | Tampa |
| State | FL |
Description
Public Announcement in Compliance With Requirements of Section 287.055 Florida Statutes (Consultants’ Competitive Negotiation Act) Applicable Law, Executive Orders, Rules, Regulations, and The City’s Standard Procedures. Notice of Intent to Award Shall be posted, if at all, on the City’s Website accessible by utilizing the website link: www.tampagov.net/contract-administration/programs/architectural-engineeringconstruction- and-related-rfqs . The City of Tampa Wastewater Department desires to obtain Design Services to complete the replacement of the 43rd St. Pump Station Force Main. Services will include, but not limited to, alternate route evaluation, survey, geotechnical services, final design, specifications, cost estimating, identifying subcontractor opportunities, Subsurface Utility Engineering (SUE), utility notification and coordination, easement acquisition as needed, permitting, public outreach, limited bid assistance, project management, limited construction engineering and inspection (CEI) services, as-built preparation and all related work required for a complete project. Background: The 43rd St. Pump Station Force Main was placed into service in 1983. The force main conveys wastewater from the 43rd St Pump Station located at 6524 N 43rd St to the Sulphur Springs PS 42" force main interconnection at Emma St and 25th St. The original pipeline consists of 16,423 LF of 24” Prestressed Cylinder Concrete (PCCP) pipe. The scope of the design will include, but not limited to: 1. Alternative route evaluation for the selection of the preferred location of the new force main 2. Complete design of selected alternative route 3. Complete permitting through all local, state, and federal agencies 4. Assistance with easement acquisition including survey (if needed) 5. Assistance with construction services including shop drawing reviews, responding to RFI’s, inspections 6. Preparation of As-builts and permit close-outs
NON-MANDATORY A pre-submission conference will be conducted at 3 PM November 16, 2026 in the City Council Chambers, third floor Old City Hall, 315 E. Kennedy Blvd. Tampa, FL 33602.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |