WC2608 SWOPE Stormwater Basin Retrofit Project
Summary
Project Title: WC2608 SWOPE Stormwater Basin Retrofit Project Project No: 7561102523.1 Location: Southeast corner of the intersection of S High St and E Campus Dr, West Chester, PA Project Scope: WORK COVERED BY CONTRACT DOUMENTS Work shall consist of clearing and demo, erosion and sediment controls, basin regarding, underdrain system, outlet structure replacement, drainage structures and piping, gabion basket forebay, amended soil installation, and other work as shown in the Contract Documents. Work included under this Project consists of the retrofit of an existing detention basin, to include clearing and grubbing, the installation of amended soils and an underdrain, an outlet structure, and outlet structure piping to connect to the existing storm sewer within East Campus Drive. PRE BID / SITE VISIT: NOVEMBER 6, 2026 11:00 AM Contract Time: December 7, 2026 - July 3, 2027; 208 Days Prevailing Wages: Yes; The Prevailing Minimum Wage Determination for this Project is serial number 26-07767, Date: 08/25/2026, classification; Highway Liquidated Damages: No Contract Cost Ranges: WC2608.1 General Construction $450,000 to $550,000
Details
| Solicitation Number | West Chester University, Chester County |
| Type | IFB |
| Posted | 2026-10-30 11:00AM EDT (10 days ago) |
| Response Deadline | 2026-11-20 2:00PM EST (in 10 days) |
| State | PA |
Description
Project Title: WC2608 SWOPE Stormwater Basin Retrofit Project Project No: 7561102523.1 Location: Southeast corner of the intersection of S High St and E Campus Dr, West Chester, PA Project Scope: WORK COVERED BY CONTRACT DOUMENTS Work shall consist of clearing and demo, erosion and sediment controls, basin regarding, underdrain system, outlet structure replacement, drainage structures and piping, gabion basket forebay, amended soil installation, and other work as shown in the Contract Documents. Work included under this Project consists of the retrofit of an existing detention basin, to include clearing and grubbing, the installation of amended soils and an underdrain, an outlet structure, and outlet structure piping to connect to the existing storm sewer within East Campus Drive. PRE BID / SITE VISIT: NOVEMBER 6, 2026 11:00 AM Contract Time: December 7, 2026 - July 3, 2027; 208 Days Prevailing Wages: Yes; The Prevailing Minimum Wage Determination for this Project is serial number 26-07767, Date: 08/25/2026, classification; Highway Liquidated Damages: No Contract Cost Ranges: WC2608.1 General Construction $450,000 to $550,000
Contact
| Email / phone | 🔒 Available with Pro Upgrade |