REQUEST FOR QUALIFICATIONS for PROFESSIONAL ENGINEERING DESIGN AND CONSTRUCTION PHASE SERVICES FOR WASTEWATER RECLAMATION FACILITY HARDENING PROJECT
Summary
The Project will harden and improve resiliency at the existing Wastewater Reclamation Facility. Improvements include modernization of the existing No. 1 and No. 2 Headworks facilities, corresponding process and piping modifications, and construction of a new equalization basin or tank to provide surge storage during storm events. These improvements are intended to balance influent flows, increase hydraulic capacity, and allow the facility to safely manage extreme wet-weather conditions without compromising treatment performance or causing upstream overflows.
MANDATORY A mandatory Pre-RFQ site visit for interested parties will be held at the Wastewater Treatment Plant Conference Room located at 140 White Way, Immokalee, FL at 10:00 AM on November 9, 2026.
Details
| Solicitation Number | RFQ-RFQ 2026-03-0-2026/SC |
| Type | RFQ |
| Posted | 2026-10-29 9:00AM EDT (11 days ago) |
| Response Deadline | 2026-11-25 12:00PM EST (in 15 days) |
| City | Immokalee |
| State | FL |
Description
The Project will harden and improve resiliency at the existing Wastewater Reclamation Facility. Improvements include modernization of the existing No. 1 and No. 2 Headworks facilities, corresponding process and piping modifications, and construction of a new equalization basin or tank to provide surge storage during storm events. These improvements are intended to balance influent flows, increase hydraulic capacity, and allow the facility to safely manage extreme wet-weather conditions without compromising treatment performance or causing upstream overflows.
MANDATORY A mandatory Pre-RFQ site visit for interested parties will be held at the Wastewater Treatment Plant Conference Room located at 140 White Way, Immokalee, FL at 10:00 AM on November 9, 2026.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |