FY2023-24 Culvert Replacements - Lincoln Rd at Snake River
Open
Bonfire
Summary
The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary for the FY2023-24 Culvert Replacements – Lincoln Rd at Snake River. The project consists of dewatering the canal, cleaning and removing sediment from both existing culverts, sealing interior concrete joints, and applying a high-strength spray-applied lining system. Work also includes temporary traffic control and road closure, proper waste disposal, and final inspection. As an additive alternative, existing fence posts and the wood board headwall may be replaced in kind or with an approved equivalent structure.
Details
| Solicitation Number | ST31002440N |
| Type | RFB |
| Posted | 2026-10-28 8:00PM EDT (12 days ago) |
| Response Deadline | 2026-11-10 12:00PM EST (in 16 hours) |
| State | CA |
Description
The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary for the FY2023-24 Culvert Replacements – Lincoln Rd at Snake River. The project consists of dewatering the canal, cleaning and removing sediment from both existing culverts, sealing interior concrete joints, and applying a high-strength spray-applied lining system. Work also includes temporary traffic control and road closure, proper waste disposal, and final inspection. As an additive alternative, existing fence posts and the wood board headwall may be replaced in kind or with an approved equivalent structure.
Contact
| Name | Bryce Deabel |
| Email / phone | 🔒 Available with Pro Upgrade |