SLCo FCE134740 Hauling and Disposal of Dredged Material from Lee Drain

Agency: State of Utah Solicitation #: SLCo FCE134740 Hauling and Disposal of Dredged Material from Lee Drain Due: 2026-11-17 3:00PM EST (in 7 days)
Open Bonfire

Summary

Salt Lake County, on behalf of its Division of Flood Control, “County” is solicitating bids from qualified firms “Bidder / Contractor” to provide services for the loading, hauling and disposal of bulk materials resulting from the dredging of Lee Drain including (but not limited to) dredged sediment, riprap, sand, woody debris, and miscellaneous refuse. The County’s best estimate of the material quantity is approximately 13,850 tons. The County has divided the length of Lee Drain into seven zones; the County reserves the right to award only a portion of these zones based on available funding. Zone 1 will form the base bid. Zones 2, 3, 4, 5, 6, and 7 are assigned to Alternatives A, B, C, D, E, and F, respectively. The County is considering two options, which are described below. The County may award either Option I or Option II based on total cost and operational considerations. The County reserves the right to reject the option with the lowest stated total cost for option 1 if option two is determined to be operationally in the County’s best interest. Option I: The loading of material shall be performed by County Flood Control Operations Crew using County equipment. In this case, County Staff will be on site operating a loader and/or excavator from 7:30 am to Contractor’s end of day. Option II: The loading of material shall be performed entirely by the Contractor. The Contractor shall provide all supervision, labor, tools, fuel, and equipment (such as loaders and/or excavators) necessary to load the material. Loading equipment shall be appropriate for the site conditions and material and shall be operated by qualified personnel. Under either loading option, bidders are to provide trucks and drivers for hauling and disposal of dredged material located in each mapped segment. Material may be disposed of in any legal manner or location determined by the contractor. Contractor is responsible for maintaining appropriate tracking controls and BMPs for the duration of the project including cleaning and maintaining access roads and public streets as well as giving a 2-day notice prior to project start to Trever Swensen (801)-971-2146. Weekend and holiday work is prohibited. Bidders are reminded not to contact County personnel and are to direct all questions/comments to the Public Q&A within the Bonfire portal during the term of the solicitation period. Contractor is to legally dispose of hauled material at a designated landfill or other location of their choosing at which they have the legal authorization to dispose of the material. Weigh tickets will be required to determine actual quantities transported. The Contractor assumes all liability and holds Salt Lake County harmless if material is disposed of illegally. Material has been tested by the County and can be assumed to be acceptable for disposal at the Salt Lake County Landfill. Contractor must meet the following requirements: 1. Contractor must be bondable to a minimum of the full contract price. The Bid Bond should be submitted on AIA Document A310, as published by the American Institute of Architects, 1736 N.Y. Ave. N.W., Washington, D.C. 20006. If said form is not reasonably available, bid security may be submitted on another form, provided the same is acceptable to the OWNER and approval of said form is obtained by Bidder prior to submitting Bid. 2. Contractor must have Worker’s Compensation Insurance, Commercial Automobile Insurance, and Liability Insurance to cover the contract as stated in the attached Short Form Construction Contract and summarized under insurance requirements below. 3. Contractor must have a proven performance record as a contractor in the State including the attributes of timely performance and quality workmanship. The County will require that references be provided from previous clients during the past 3 years (see Section 9.0 References/Experience below). The County reserves the right to reject any proposal based on poor references and/or project performance. 4. Bidders must hold either an S-310 or E-100 license. All subcontractors must hold the proper license for the portion of the work of the Project they are performing, and at the request of the County, provide any and all information required to substantiate their proper licensure. The Contract will be awarded to the lowest, responsive and responsible bidder, based on the lowest combination of base bid and prioritized alternates up to the budget amount, provided the bid is reasonable and in the best interests of the County to accept. Alternates will be accepted on a prioritized basis with Alternate 1 being highest priority, Alternate 2 having second priority, etc. The County may designate alternates as additions to or deductions from the base bid. Project closes Nov 17, 2026 1:00 PM MST.

Details

Solicitation NumberSLCo FCE134740 Hauling and Disposal of Dredged Material from Lee Drain
Typebonfire
Posted2026-10-28 12:00PM EDT (12 days ago)
Response Deadline2026-11-17 3:00PM EST (in 7 days)
StateUT

Description

Salt Lake County, on behalf of its Division of Flood Control, “County” is solicitating bids from qualified firms “Bidder / Contractor” to provide services for the loading, hauling and disposal of bulk materials resulting from the dredging of Lee Drain including (but not limited to) dredged sediment, riprap, sand, woody debris, and miscellaneous refuse. The County’s best estimate of the material quantity is approximately 13,850 tons. The County has divided the length of Lee Drain into seven zones; the County reserves the right to award only a portion of these zones based on available funding. Zone 1 will form the base bid. Zones 2, 3, 4, 5, 6, and 7 are assigned to Alternatives A, B, C, D, E, and F, respectively. The County is considering two options, which are described below. The County may award either Option I or Option II based on total cost and operational considerations. The County reserves the right to reject the option with the lowest stated total cost for option 1 if option two is determined to be operationally in the County’s best interest. Option I: The loading of material shall be performed by County Flood Control Operations Crew using County equipment. In this case, County Staff will be on site operating a loader and/or excavator from 7:30 am to Contractor’s end of day. Option II: The loading of material shall be performed entirely by the Contractor. The Contractor shall provide all supervision, labor, tools, fuel, and equipment (such as loaders and/or excavators) necessary to load the material. Loading equipment shall be appropriate for the site conditions and material and shall be operated by qualified personnel. Under either loading option, bidders are to provide trucks and drivers for hauling and disposal of dredged material located in each mapped segment. Material may be disposed of in any legal manner or location determined by the contractor. Contractor is responsible for maintaining appropriate tracking controls and BMPs for the duration of the project including cleaning and maintaining access roads and public streets as well as giving a 2-day notice prior to project start to Trever Swensen (801)-971-2146. Weekend and holiday work is prohibited. Bidders are reminded not to contact County personnel and are to direct all questions/comments to the Public Q&A within the Bonfire portal during the term of the solicitation period. Contractor is to legally dispose of hauled material at a designated landfill or other location of their choosing at which they have the legal authorization to dispose of the material. Weigh tickets will be required to determine actual quantities transported. The Contractor assumes all liability and holds Salt Lake County harmless if material is disposed of illegally. Material has been tested by the County and can be assumed to be acceptable for disposal at the Salt Lake County Landfill. Contractor must meet the following requirements: 1. Contractor must be bondable to a minimum of the full contract price. The Bid Bond should be submitted on AIA Document A310, as published by the American Institute of Architects, 1736 N.Y. Ave. N.W., Washington, D.C. 20006. If said form is not reasonably available, bid security may be submitted on another form, provided the same is acceptable to the OWNER and approval of said form is obtained by Bidder prior to submitting Bid. 2. Contractor must have Worker’s Compensation Insurance, Commercial Automobile Insurance, and Liability Insurance to cover the contract as stated in the attached Short Form Construction Contract and summarized under insurance requirements below. 3. Contractor must have a proven performance record as a contractor in the State including the attributes of timely performance and quality workmanship. The County will require that references be provided from previous clients during the past 3 years (see Section 9.0 References/Experience below). The County reserves the right to reject any proposal based on poor references and/or project performance. 4. Bidders must hold either an S-310 or E-100 license. All subcontractors must hold the proper license for the portion of the work of the Project they are performing, and at the request of the County, provide any and all information required to substantiate their proper licensure. The Contract will be awarded to the lowest, responsive and responsible bidder, based on the lowest combination of base bid and prioritized alternates up to the budget amount, provided the bid is reasonable and in the best interests of the County to accept. Alternates will be accepted on a prioritized basis with Alternate 1 being highest priority, Alternate 2 having second priority, etc. The County may designate alternates as additions to or deductions from the base bid. Project closes Nov 17, 2026 1:00 PM MST.

Contact

NameAaron Stone
Email / phone 🔒 Available with Pro Upgrade