2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay
Generic-bids
Summary
Project construction may include but is notlimited to: Asphalt milling and overlay, seal coat, base and pavementreplacement, cleaning and sealing joints and cracks, curb ramps, concretecurbs, sidewalks, driveways, concrete retaining walls-combination type, speedhumps, topsoil, sodding, signage, pavement markings installation, adjustingexisting valve boxes, meter boxes and manholes, and any other items requireddue to the site conditions to accomplish the project scope.
Details
| Solicitation Number | 23-04203-08. |
| Type | agency-site |
| Posted | 2026-10-28 1:00AM EDT (13 days ago) |
| Response Deadline | 2026-12-01 1:00AM EST (in 20 days) |
| State | TX |
Description
Project construction may include but is notlimited to: Asphalt milling and overlay, seal coat, base and pavementreplacement, cleaning and sealing joints and cracks, curb ramps, concretecurbs, sidewalks, driveways, concrete retaining walls-combination type, speedhumps, topsoil, sodding, signage, pavement markings installation, adjustingexisting valve boxes, meter boxes and manholes, and any other items requireddue to the site conditions to accomplish the project scope.
Contact
| Name | Sandra Figueroa |
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
📄 ESBD_572306_1793215272266_23-04203-08 Solicitation Synopsis Non-Discretionary 3.25.pdfSolicitation Synopsis