2027-2034 Wright-Patterson Air Force Base Multiple Award Construction Contract (MACC)
Summary
This is a follow-on Multiple Award Construction Contract (MACC) Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for design-build, design-bid-build, and Progressive Design Build (PDB) construction projects, which are specific to WPAFB, and applicable to individual Task Orders. Work will consist of a broad range of maintenance, repair, alteration and/or new construction work on various real property. Type of work the contractor can expect (not inclusive): new construction of buildings and structures; alteration and repair of buildings, structures, roads, airfields, ground, roofs; specialty construction; utilities; and miscellaneous services including remediation/hazardous waste removal (i.e. asbestos, lead paint etc.). Contractor efforts may also include design/build from concept to 100% design.
Details
| Solicitation Number | FA860127R0004 |
| Type | Solicitation |
| Posted | 2026-10-28 8:34AM EDT (12 days ago) |
| Response Deadline | 2026-12-11 9:00AM EST (in 1 month) |
| NAICS Code | 236220 |
| City | WRIGHT PATTERSON AFB |
| State | OH |
| ZIP | 45433-5344 |
Description
This is a follow-on Multiple Award Construction Contract (MACC) Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for design-build, design-bid-build, and Progressive Design Build (PDB) construction projects, which are specific to WPAFB, and applicable to individual Task Orders. Work will consist of a broad range of maintenance, repair, alteration and/or new construction work on various real property. Type of work the contractor can expect (not inclusive): new construction of buildings and structures; alteration and repair of buildings, structures, roads, airfields, ground, roofs; specialty construction; utilities; and miscellaneous services including remediation/hazardous waste removal (i.e. asbestos, lead paint etc.). Contractor efforts may also include design/build from concept to 100% design.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |