HSR HF Dipole and Quad SC Magnet PS and Quench

Agency: ENERGY, DEPARTMENT OF Location: Upton, NY Solicitation #: APP00730MB Due: 2026-12-11 12:00PM EST (in 1 month)
Yes Federal

Summary

This is an RFI/Sources Sought for HSR HF Dipole and Quad SC Magnet PS and Quench. Please review the three posted attachments for requested information from your company. All questions and submittals should be sent to the Contract Specialist listed in the RFI document and listed on this SAM.gov posting. STEP files are available but are unable to be loaded into this system. Please contact the Contract Specialist for those files to be emailed. A technical note for these files: These STEP geometry files are NOT mechanical construction files. The files show a simplified view the 3D stripline kicker geometry based on the electromagnetic design, as illustration for the mechanical implementation of a RF test mockup (no vacuum) and of a vacuum compatible prototype stripline kicker. Beside that, there still is substantial thermal analysis to be performed by the vendor. Submittals are due no later than 12/11/2026 at 5PM EST.

Details

Solicitation NumberAPP00730MB
TypeSources Sought
Posted2026-10-28 6:10AM EDT (12 days ago)
Response Deadline2026-12-11 12:00PM EST (in 1 month)
NAICS Code335999
CityUpton
StateNY
ZIP11973

Description

This is an RFI/Sources Sought for HSR HF Dipole and Quad SC Magnet PS and Quench. Please review the three posted attachments for requested information from your company. All questions and submittals should be sent to the Contract Specialist listed in the RFI document and listed on this SAM.gov posting. STEP files are available but are unable to be loaded into this system. Please contact the Contract Specialist for those files to be emailed. A technical note for these files: These STEP geometry files are NOT mechanical construction files. The files show a simplified view the 3D stripline kicker geometry based on the electromagnetic design, as illustration for the mechanical implementation of a RF test mockup (no vacuum) and of a vacuum compatible prototype stripline kicker. Beside that, there still is substantial thermal analysis to be performed by the vendor. Submittals are due no later than 12/11/2026 at 5PM EST.

Contact

Email / phone 🔒 Available with Pro Upgrade