1H3 Airport Notice-to-Airport-Consultants

Agency: State Technical College of Missouri Location: Linn, MO Solicitation #: RFP-002-0-2026/AA Due: 2026-11-13 6:00PM EST (in 3 days)
Active Demandstar

Summary

The State Technical College of Missouri (Sponsor) is hereby soliciting Statements of Qualifications and Experience from qualified consultants for airfield development projects at the State Technical College of Missouri Airport (K1H3) located in Linn, Missouri. Projects may be subject to future receipt of Federal funding under the Federal Aviation Administration (FAA) Airport Improvement Program, as administered by the Missouri Department of Transportation (MoDOT) through the State Block Grant Program (SBGP). These projects may include the following: 1. Obstacle (Tree) Clearing, Estimated value $200,000 2. Aviation Hangar Development, Estimated value $10,500,000 3. T-Hangar Development, Estimated value $1,300,000 4. H-Hangar Apron Reconstruction, Estimated value $1,700,000 5. Airfield Electrical Replacement, Estimated value $800,000 6. Runway Pavement Rehabilitation and Marking, Estimated value $250,000 7. Grading and Drainage Improvements, Estimated value $200,000 8. Seal Coat & Pavement Repairs to Taxiways, Estimated value $150,000 The required services include, but are not limited to, engineering services for preliminary, design, bidding, and construction phases and incidental special services including survey, architectural, and geotechnical. Additionally, preparing categorical exclusion documentation, as-built ALP updates, and other miscellaneous tasks may be required. The consultant should provide the name(s) of preferred firm(s) for any work which is likely to be sub-consulted. Subconsultant changes can occur with Sponsor approval. At the Sponsor’s discretion, this selection can be retained for projects initiated within five years or until all projects are complete. Projects other than those listed above will require a new solicitation except as allowed in FAA Advisory Circular 150/5100-14 paragraph 2.7.2 (4). Disclosure: Under a previous agreement, WSP assisted the Sponsor with preparation of their CIP and the above cost estimates. Open

Details

Solicitation NumberRFP-002-0-2026/AA
TypeRFP
Posted2026-10-28 3:02PM EDT (12 days ago)
Response Deadline2026-11-13 6:00PM EST (in 3 days)
CityLinn
StateMO

Description

The State Technical College of Missouri (Sponsor) is hereby soliciting Statements of Qualifications and Experience from qualified consultants for airfield development projects at the State Technical College of Missouri Airport (K1H3) located in Linn, Missouri. Projects may be subject to future receipt of Federal funding under the Federal Aviation Administration (FAA) Airport Improvement Program, as administered by the Missouri Department of Transportation (MoDOT) through the State Block Grant Program (SBGP). These projects may include the following: 1. Obstacle (Tree) Clearing, Estimated value $200,000 2. Aviation Hangar Development, Estimated value $10,500,000 3. T-Hangar Development, Estimated value $1,300,000 4. H-Hangar Apron Reconstruction, Estimated value $1,700,000 5. Airfield Electrical Replacement, Estimated value $800,000 6. Runway Pavement Rehabilitation and Marking, Estimated value $250,000 7. Grading and Drainage Improvements, Estimated value $200,000 8. Seal Coat & Pavement Repairs to Taxiways, Estimated value $150,000 The required services include, but are not limited to, engineering services for preliminary, design, bidding, and construction phases and incidental special services including survey, architectural, and geotechnical. Additionally, preparing categorical exclusion documentation, as-built ALP updates, and other miscellaneous tasks may be required. The consultant should provide the name(s) of preferred firm(s) for any work which is likely to be sub-consulted. Subconsultant changes can occur with Sponsor approval. At the Sponsor’s discretion, this selection can be retained for projects initiated within five years or until all projects are complete. Projects other than those listed above will require a new solicitation except as allowed in FAA Advisory Circular 150/5100-14 paragraph 2.7.2 (4). Disclosure: Under a previous agreement, WSP assisted the Sponsor with preparation of their CIP and the above cost estimates. Open

Contact

Email / phone 🔒 Available with Pro Upgrade