2027 Sealcoat Program
Summary
The Engineering Services Department of the City of San Angelo is requesting bids for the 2027 Sealcoat Project. The project will consist of construction of a sealcoat surface treatment composed of a single application of asphaltic material and aggregate applied on the existing pavement surfaces within the City of San Angelo city limits. The project includes areas for COSA and several Tom Green Co roads.
Details
| Solicitation Number | ES-01-27 |
| Type | RFB |
| Posted | 2026-10-27 3:00PM EDT (13 days ago) |
| Response Deadline | 2026-11-17 3:00PM EST (in 7 days) |
| State | TX |
Description
The Engineering Services Department of the City of San Angelo is requesting bids for the 2027 Sealcoat Project. The project will consist of construction of a sealcoat surface treatment composed of a single application of asphaltic material and aggregate applied on the existing pavement surfaces within the City of San Angelo city limits. The project includes areas for COSA and several Tom Green Co roads.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
๐ COSA Standard Performance Terms and Conditions (eff 4-16-18).pdf DocumentationCOSA Standard Performance Terms and Conditions (eff 4-16-18)
-
๐ Debarment and Suspension Certification - Form.pdf DocumentationDebarment and Suspension Certification - Form
-
๐ Vendor Compliance with Reciprocity on Non-Resident Vendors.pdf DocumentationVendor Compliance with Reciprocity on Non-Resident Vendors
-
๐ Local Preference Consideration - Application.pdf DocumentationLocal Preference Consideration - Application
-
๐ Local Preference Consideration - Instructions.pdf DocumentationLocal Preference Consideration - Instructions
-
๐ Debarment and Suspension Certification - Instructions.pdf DocumentationDebarment and Suspension Certification - Instructions
-
๐ Disclosure of Certain Relationships 07142026.pdf DocumentationDisclosure of Certain Relationships
-
๐ COSA Owners Construction General Conditions (eff 4-16-18).pdf DocumentationCOSA Owners Construction General Conditions (eff 4-16-18)
-
๐ 04 Specifications Worksheet.pdf Documentation
-
๐ References-Subcontractors-Suppliers.pdf DocumentationReferences, Subcontractors, and Suppliers Form