27-2100 IFB Route 9 Water Main Rehabilitation-Phase I
Summary
The Work consists of the installation of a structural liner in an existing 8-inch diameter asbestos-concrete (AC) water main within the Route 9 right-of-way from Otis Street to Station 4+85 and within Otis Street from Station 0+00 to 4+56 in Westborough, MA.
Details
| Solicitation Number | BD-27-1348-DPW34-131-134850 |
| Type | OPEN |
| Posted | 2026-10-28 8:00AM EDT (13 days ago) |
| Response Deadline | 2026-11-19 2:00PM EST (in 9 days) |
| State | MA |
Description
The Work consists of the installation of a structural liner in an existing 8-inch diameter asbestos-concrete (AC) water main within the Route 9 right-of-way from Otis Street to Station 4+85 and within Otis Street from Station 0+00 to 4+56 in Westborough, MA.
Contact
| Name | Katelyn Barker |
| Email / phone | 🔒 Available with Pro Upgrade |