IFB No. 27-07 Bartlet Mall Restoration Project
Summary
Scope of Work includes: installation of erosion controls, pond dewatering, fountain removal, restoration, and re-installation, installation of water quality pipes and methane venting system, installation of liner system consisting of geogrid, HDPE/LDPE liner, Armor Stone, and Benthic Sediment, installation of wet well, pump, drywells, bedrock well system, and pumphouse, grading and installation of walkway materials as noted, installation of dock, installation of plantin
Details
| Solicitation Number | BD-27-1158-NBPT3-NBPT3-134877 |
| Type | OPEN |
| Posted | 2026-10-28 10:00AM EDT (12 days ago) |
| Response Deadline | 2026-12-17 11:00AM EST (in 1 month) |
| State | MA |
Description
Scope of Work includes: installation of erosion controls, pond dewatering, fountain removal, restoration, and re-installation, installation of water quality pipes and methane venting system, installation of liner system consisting of geogrid, HDPE/LDPE liner, Armor Stone, and Benthic Sediment, installation of wet well, pump, drywells, bedrock well system, and pumphouse, grading and installation of walkway materials as noted, installation of dock, installation of plantin
Contact
| Name | - download bid documents at www.cityofnewburyport.com/bids |
| Email / phone | 🔒 Available with Pro Upgrade |