2026 - 2027 Saratoga Springs Irrigation Well 9 RFB
Summary
The Project includes the drilling, construction, and testing of a new irrigation well (Irrigation Well 9). The well will be drilled using the flooded reverse mud rotary drilling method to an approximate depth of 1200 feet deep. Anticipated at 20-inch diameter well casing and engineered gravel pack. The project will include rig development, pump development and testing, final video and disinfection. The well is expected to be completed in summer 2027. Mandatory Pre-bid Meeting: Tuesday November 3rd @ 11:00 am. Construction details should be uploaded by the end of the week.
Details
| Solicitation Number | 2026-016 |
| Type | IFB |
| Posted | 2026-10-27 2:00AM EDT (14 days ago) |
| Response Deadline | 2026-11-19 3:00PM EST (in 9 days) |
| State | UT |
Description
The Project includes the drilling, construction, and testing of a new irrigation well (Irrigation Well 9). The well will be drilled using the flooded reverse mud rotary drilling method to an approximate depth of 1200 feet deep. Anticipated at 20-inch diameter well casing and engineered gravel pack. The project will include rig development, pump development and testing, final video and disinfection. The well is expected to be completed in summer 2027. Mandatory Pre-bid Meeting: Tuesday November 3rd @ 11:00 am. Construction details should be uploaded by the end of the week.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
๐ Irrigation Well 9 RFB.pdf Documentation