US199 @ Demaray Dr MP 2.33 Culvert Replacement Project
Sent
Periscope-s2g
Summary
The purpose of the proposed project is to remove 135 feet of 24" culverts that crosses under US199 and Demaray Drive and replace it with 135' of 24" culvert. The new culvert will be tied back into existing manhole on the shoulder in the multi-use path and daylight into the ditch on the other side.
Details
| Solicitation Number | S-73000-00018259 |
| Type | OPEN |
| Posted | 2026-10-27 7:10PM EDT (13 days ago) |
| Response Deadline | 2026-11-11 5:00PM EST (in 1 day) |
| State | OR |
Description
The purpose of the proposed project is to remove 135 feet of 24" culverts that crosses under US199 and Demaray Drive and replace it with 135' of 24" culvert. The new culvert will be tied back into existing manhole on the shoulder in the multi-use path and daylight into the ditch on the other side.
Contact
| Name | Terri Sinclair-Olson |
| Email / phone | 🔒 Available with Pro Upgrade |