Storm Water Repair and Improvement FY2027-D-PR
Summary
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint an structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties. The estimated cost of this project is $5,540,506.
Details
| Solicitation Number | FY27-ITBCon-34 |
| Type | ITB |
| Posted | 2026-10-26 4:30PM EDT (14 days ago) |
| Response Deadline | 2026-11-19 10:00AM EST (in 9 days) |
| State | NC |
Description
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint an structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties. The estimated cost of this project is $5,540,506.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
๐ C-111 (FORMAL) Advertisement FY27-D.pdf Documentation
-
๐ Electronic Bid Form.xlsx Documentation