Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262
Summary
Demolition and installation of process systems and equipment at the City of Hollywood Water Treatment Facility. Major work elements include removal and replacement of lime slaker systems no. 2 and 3, including associated pumps, tanks, piping, valves, electrical, controls, and structural repairs; demolition and replacement of the filter surface wash system; demolition and replacements of the sodium hexametaphosphate (SHMP) feed system, including new equipment pads, trench grating, electrical, controls, and flow monitoring; and demolition and replacement of sludge pump piping, flushing water line, and reconfiguration of the existing standby sludge pump. All work shall include start-up, testing, and commissioning as required to provide fully operational systems.
Details
| Solicitation Number | IFB-440-26-JM |
| Type | Active |
| Posted | 2026-10-26 12:00AM EDT (15 days ago) |
| Response Deadline | 2026-12-03 3:00PM EST (in 23 days) |
| City | Hollywood |
| State | FL |
| ZIP | 33020 |
Description
Demolition and installation of process systems and equipment at the City of Hollywood Water Treatment Facility. Major work elements include removal and replacement of lime slaker systems no. 2 and 3, including associated pumps, tanks, piping, valves, electrical, controls, and structural repairs; demolition and replacement of the filter surface wash system; demolition and replacements of the sodium hexametaphosphate (SHMP) feed system, including new equipment pads, trench grating, electrical, controls, and flow monitoring; and demolition and replacement of sludge pump piping, flushing water line, and reconfiguration of the existing standby sludge pump. All work shall include start-up, testing, and commissioning as required to provide fully operational systems.
Contact
| Name | Julissa Marcano |
| Email / phone | 🔒 Available with Pro Upgrade |