CLASS 2 LANDFILL PARTIAL CLOSURE
Summary
The County of Greenville is seeking proposals for the Partial Closure Construction of the Class 2 Unit 2 Landfill at the Twin Chimneys Landfill, subject to the conditions and all provisions set forth herein and in the Drawings and Specifications (attachment C & D). A portion of the Class 2 Unit 2 Landfill has achieved final grades. The closure consists of constructing:
- A stormwater pond
- Subgrade preparation
- Structural fill of a perimeter berm
- Stone access road
- Erosion control measures (silt fence, erosion control blankets, seeding).
The project is approximately 301,000 cy excavation and 120,000 cy of structural fill. The soil borrow area is within the Unit 2 Landfill footprint and has been cleared.
The County desires the project to reach substantial completion within 210 calendar days.
Details
| Solicitation Number | RFP #27027 |
| Type | Active |
| Posted | 2026-10-23 12:00AM EDT (18 days ago) |
| Response Deadline | 2026-11-16 3:00PM EST (in 6 days) |
| City | Greenville |
| State | SC |
| ZIP | 29601 |
Description
The County of Greenville is seeking proposals for the Partial Closure Construction of the Class 2 Unit 2 Landfill at the Twin Chimneys Landfill, subject to the conditions and all provisions set forth herein and in the Drawings and Specifications (attachment C & D). A portion of the Class 2 Unit 2 Landfill has achieved final grades. The closure consists of constructing:
- A stormwater pond
- Subgrade preparation
- Structural fill of a perimeter berm
- Stone access road
- Erosion control measures (silt fence, erosion control blankets, seeding).
The project is approximately 301,000 cy excavation and 120,000 cy of structural fill. The soil borrow area is within the Unit 2 Landfill footprint and has been cleared.
The County desires the project to reach substantial completion within 210 calendar days.
Contact
| Name | Jackie Brown |
| Email / phone | 🔒 Available with Pro Upgrade |