Rough Riders Sports Complex Parking Reconstruction
Open
Bonfire
Summary
This project involves removing the existing asphalt parking lot, removing portions of concrete curb and gutter, excavating, and repaving the parking lot with either 3” inches of Type D asphalt over 6” lime stabilized subgrade or 5” TxDOT flexbase. The project also includes modifying the driveway and removing and replacing small sections of sidewalk.
Details
| Solicitation Number | 2710-007 |
| Type | IFB |
| Posted | 2026-10-23 9:00AM EDT (17 days ago) |
| Response Deadline | 2026-11-12 11:00AM EST (in 2 days) |
| State | TX |
Description
This project involves removing the existing asphalt parking lot, removing portions of concrete curb and gutter, excavating, and repaving the parking lot with either 3” inches of Type D asphalt over 6” lime stabilized subgrade or 5” TxDOT flexbase. The project also includes modifying the driveway and removing and replacing small sections of sidewalk.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
📄 Frisco Sport Complext-Rough Riders Parking Reconst- Project Manual.pdf DocumentationProject Manual