Reuse Pilot System Skid-Title 22 Recycled Water (Turnkey)
Summary
This project is to establish a contract for a complete and turnkey trailer, or container-mounted Reuse Pilot System Skid. The Reuse Pilot System Skid shall be capable of producing advanced-treated water consistent with the California Code of Regulations, Title 22 criteria. The system shall be fully enclosed, self-contained, and suitable for outdoor employment at multiple Charlotte Water Resource Recovery Facilities. The pilot shall be designed for mobility, durability, and ease of operation by utility staff.
Details
| Solicitation Number | FY27-ITB-03 |
| Type | ITB |
| Posted | 2026-10-22 12:00AM EDT (19 days ago) |
| Response Deadline | 2026-12-14 2:00PM EST (in 1 month) |
| State | NC |
Description
This project is to establish a contract for a complete and turnkey trailer, or container-mounted Reuse Pilot System Skid. The Reuse Pilot System Skid shall be capable of producing advanced-treated water consistent with the California Code of Regulations, Title 22 criteria. The system shall be fully enclosed, self-contained, and suitable for outdoor employment at multiple Charlotte Water Resource Recovery Facilities. The pilot shall be designed for mobility, durability, and ease of operation by utility staff.
Contact
| Name | Wendy Raiford |
| Email / phone | 🔒 Available with Pro Upgrade |