Plummer Community Corrections Center Building Demolition

Agency: Delaware Office of Management and Budget - Division of Facility Management Solicitation #: OMB-MC1002001330 Due: 2026-11-23 1:00PM EST (in 12 days)
Open Bonfire

Summary

The project generally consists of the complete demolition and removal of nine (9) existing buildings at the former Plummer Community Corrections Center, including all associated building foundations, footings, concrete slabs, and below-grade building construction. All demolition debris shall be removed from the site and disposed of in accordance with applicable regulations. Existing site utilities shall be disconnected, cut, and permanently capped at or immediately adjacent to each building. Existing site utility distribution systems shall remain in place. All existing site improvements, including asphalt paving, roadways, parking areas, sidewalks, curbing, and perimeter fencing, shall remain and be protected throughout demolition activities. Following demolition, building excavations shall be backfilled and rough graded to provide safe, stable, and properly draining conditions. Comprehensive site grading, paving replacement, landscaping, and site redevelopment are not included in the project scope. Hazardous and regulated material abatement will be completed by others prior to demolition.

Details

Solicitation NumberOMB-MC1002001330
TypeITB
Posted2026-10-21 12:00AM EDT (20 days ago)
Response Deadline2026-11-23 1:00PM EST (in 12 days)
StateDE

Description

The project generally consists of the complete demolition and removal of nine (9) existing buildings at the former Plummer Community Corrections Center, including all associated building foundations, footings, concrete slabs, and below-grade building construction. All demolition debris shall be removed from the site and disposed of in accordance with applicable regulations. Existing site utilities shall be disconnected, cut, and permanently capped at or immediately adjacent to each building. Existing site utility distribution systems shall remain in place. All existing site improvements, including asphalt paving, roadways, parking areas, sidewalks, curbing, and perimeter fencing, shall remain and be protected throughout demolition activities. Following demolition, building excavations shall be backfilled and rough graded to provide safe, stable, and properly draining conditions. Comprehensive site grading, paving replacement, landscaping, and site redevelopment are not included in the project scope. Hazardous and regulated material abatement will be completed by others prior to demolition.

Contact

Email / phone 🔒 Available with Pro Upgrade