Outback Facility Improvements Project Design Engineering Services
Summary
The City of Bend (the “City”) requests proposals from qualified engineering firms to serve as the design engineer (the “Designer”) and Engineer of Record (“EOR”) for the Outback Facility Improvements Project (No. 1WOFI). The Project strengthens water system resiliency, protects finished water quality, and improves power reliability at the Outback Water Filtration Facility (“WFF”), delivering the near-term improvements identified in the 2026 Outback Facility Plan, using the Construction Manager/General Contractor (“CM/GC”) alternative delivery method. The Designer must coordinate with the City, the owner's representative, the Independent Cost Estimator (“ICE”), and the CM/GC, and provide engineering services during construction. Detailed information regarding the services to be provided can be found in Exhibit A – Scope of Work.
Details
| Solicitation Number | 27-3226 |
| Type | RFP |
| Posted | 2026-10-21 4:00PM EDT (20 days ago) |
| Response Deadline | 2026-12-02 6:00PM EST (in 22 days) |
| State | OR |
Description
The City of Bend (the “City”) requests proposals from qualified engineering firms to serve as the design engineer (the “Designer”) and Engineer of Record (“EOR”) for the Outback Facility Improvements Project (No. 1WOFI). The Project strengthens water system resiliency, protects finished water quality, and improves power reliability at the Outback Water Filtration Facility (“WFF”), delivering the near-term improvements identified in the 2026 Outback Facility Plan, using the Construction Manager/General Contractor (“CM/GC”) alternative delivery method. The Designer must coordinate with the City, the owner's representative, the Independent Cost Estimator (“ICE”), and the CM/GC, and provide engineering services during construction. Detailed information regarding the services to be provided can be found in Exhibit A – Scope of Work.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
📄 Appendix A.pdf Documentation
-
📄 Exhibit E - Certification Regarding Debarment.pdf Documentation
-
📄 Exhibit F - Cost Proposal.xlsx Documentation
-
📄 Exhibit H - Certification Regarding Lobbying.pdf Documentation
-
📄 Exhibit G - Cost Proposal.docx Documentation
-
📄 REFERENCE 04 In-Conduit Hydro FACT SHEET.pdf Documentation
-
📄 REFERENCE 05 Outback Siting Study Memo.pdf Documentation
-
📄 REFERENCE 09 Outback Expansion Site TOPO 2025.pdf Documentation
-
📄 REFERENCE 08 Final Outback Site Plan 2026.pdf Documentation
-
📄 REFERENCE 10 In-Conduit Hydro Narrative.pdf Documentation
-
📄 REFERENCE 11 Pretreatment Narrative.pdf Documentation
-
📄 REFERENCE 14 CMGC Findings.pdf Documentation
-
📄 REFERENCE 15 City Council Issue Summary.pdf Documentation
-
📄 REFERENCE 16 General Land Use Application.pdf Documentation
-
📄 REFERENCE 17 Property Line Adjustment.pdf Documentation
-
📄 REFERENCE 18 Landscape Management.pdf Documentation
-
📄 REFERENCE 01 2026 Outback Facility Plan.pdf Documentation
-
📄 REFERENCE 19 FAQ - Planning.pdf Documentation
-
📄 REFERENCE 24 EST.Outback 4606 Final.pdf Documentation
-
📄 REFERENCE 21 Discovery West Master.pdf Documentation
-
📄 REFERENCE 20 LUBA 21-059.pdf Documentation
-
📄 REFERENCE 22 Federal Standards.pdf Documentation
-
📄 REFERENCE 23 DWG.Outback 4606 Signed.pdf Documentation
-
📄 REFERENCE 25 WFF Record Drawings.pdf Documentation
-
📄 REFERENCE 26 WFF Skyliner Conformed.pdf Documentation
-
📄 Exhibit D - Reference Materials.pdf Documentation