224003 Chipley REVAMP
Summary
General Project Description (See Bid Documents for complete details):
This is a full facility sustainment project that will address maintenance, repairs, and lifecycle replacement for buildings,
building equipment and systems, utilities, and components of the 17,208 square foot Readiness Center and supporting assets to keep them in good working order.
The intent is not to construct any new square footage, buildings, structures, etc., rather to sustain the overall asset inventory and maintain the asset inventory in good working order
- Roof repairs/roof replacements for buildings and structures.
- General maintenance/repair activities to exterior of buildings and structures to keep them in good working order.
- Seal building envelope(s) from the elements.
- General maintenance/repair activities in the Readiness Center and support building(s) functional areas outlined in NG PAM 415-12 (e.g. painting, flooring replacement, replace ceiling tiles as necessary, etc.).
- Repair/replacement of latrines/showers, fixtures, tile, flooring, lockers, etc.
- Repair/replacement of electrical systems/components.
- Repair/replacement of water systems and components (potable/non-potable, sewage, irrigation, fire suppression, etc.).
- Repair/replacement of HVAC systems/components.
- Repair/replacement of fire alarm system/components (alarm, mass notification system, fire suppression system, etc.).
- Repair/replacement of communications system/components as necessary.
- Repair/replace windows as necessary.
- Repair/replace fencing/gates as necessary, in order to maintain a secure facility.
- Repair/replace interior and exterior lighting as necessary.
- Parking Areas (MOV & POV) sealing/re-coating with asphalt (or similar) and re-striping parking spaces.
- Repair/replace Anti-Terrorism-Force Protection (ATFP) measures as necessary.
- Draining/grading work to address any site drainage/stormwater requirements as necessary.
- Repair/replace signage as necessary.
- Other sustainment work that is found to be necessary to keep the facility in good working order.
Details
| Type | Invitation to Bid |
| Posted | 2026-10-21 2:51PM EDT (20 days ago) |
| Response Deadline | 2026-12-17 3:00PM EST (in 1 month) |
| State | FL |
Description
General Project Description (See Bid Documents for complete details):
This is a full facility sustainment project that will address maintenance, repairs, and lifecycle replacement for buildings,
building equipment and systems, utilities, and components of the 17,208 square foot Readiness Center and supporting assets to keep them in good working order.
The intent is not to construct any new square footage, buildings, structures, etc., rather to sustain the overall asset inventory and maintain the asset inventory in good working order
- Roof repairs/roof replacements for buildings and structures.
- General maintenance/repair activities to exterior of buildings and structures to keep them in good working order.
- Seal building envelope(s) from the elements.
- General maintenance/repair activities in the Readiness Center and support building(s) functional areas outlined in NG PAM 415-12 (e.g. painting, flooring replacement, replace ceiling tiles as necessary, etc.).
- Repair/replacement of latrines/showers, fixtures, tile, flooring, lockers, etc.
- Repair/replacement of electrical systems/components.
- Repair/replacement of water systems and components (potable/non-potable, sewage, irrigation, fire suppression, etc.).
- Repair/replacement of HVAC systems/components.
- Repair/replacement of fire alarm system/components (alarm, mass notification system, fire suppression system, etc.).
- Repair/replacement of communications system/components as necessary.
- Repair/replace windows as necessary.
- Repair/replace fencing/gates as necessary, in order to maintain a secure facility.
- Repair/replace interior and exterior lighting as necessary.
- Parking Areas (MOV & POV) sealing/re-coating with asphalt (or similar) and re-striping parking spaces.
- Repair/replace Anti-Terrorism-Force Protection (ATFP) measures as necessary.
- Draining/grading work to address any site drainage/stormwater requirements as necessary.
- Repair/replace signage as necessary.
- Other sustainment work that is found to be necessary to keep the facility in good working order.
Contact
| Name | Michelle Hull |
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
๐ Part 2 Genl Terms & Conditions Chipley REVAMP.pdfPart 2 General Terms & Conditions
-
๐ Part 1 Supp Cond 224003 Chipley REVAMP.pdfPart 1 Supplemental Conditions
-
๐ Proposal & Subcontractor List.docxProposal & Subcontractors List
-
๐ ITB Level 4-5_224003 Chipley REVAMP.pdfInvitation to Bid
-
๐ Chipley REVAMP SOW 224003 Chipley REVAMP.pdfScope of Work_Project Description
-
๐ SOW for ABI #1 224003 Chipley REVAMP.pdfABI #1 Scope of Work
-
๐ FNG 5085 224003 Chipley REVAMP.docxQualification Requirements and Instructions - FNG 5085