Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261
Summary
The Work to be performed under this Contract consists of constructing the Work shown in the Contract Documents and described below. This Work consists of all the improvements, and all related appurtenances, incidentals, and General Conditions. The Work is generally described as follows:
The City wishes to undertake repair of certain existing facilities and equipment that are of a scope and complexity beyond regular operational maintenance. The City has accordingly hired Arcadis to prepare design and contract documents for bidding this work for completion by a suitable Contractor. Two maintenance packages were developed by the City and this RFP covers only the scope for Maintenance Package “A”. The design of Maintenance Package “B” will be completed by others.
Maintenance Package “A” at the Hollywood WTP will consist of the following six distinct work elements:
- Lime Silo Repairs
- Replace Silo Dust Collectors
- Replace Sludge Drum Thickener and Repair Building
- Storage Tank Nos. 3 and 4 Valves Replacement
- Replace Clearwell Sample Lines
The Work is located at the following address:
City of Hollywood, Water Treatment Plant
3441 Hollywood Boulevard
Hollywood, Florida 33021
Contracting Method: Work shall be constructed under one prime contract.
Details
| Solicitation Number | IFB-438-26-JM |
| Type | Active |
| Posted | 2026-10-20 12:00AM EDT (21 days ago) |
| Response Deadline | 2026-11-25 3:00PM EST (in 14 days) |
| City | Hollywood |
| State | FL |
| ZIP | 33020 |
Description
The Work to be performed under this Contract consists of constructing the Work shown in the Contract Documents and described below. This Work consists of all the improvements, and all related appurtenances, incidentals, and General Conditions. The Work is generally described as follows:
The City wishes to undertake repair of certain existing facilities and equipment that are of a scope and complexity beyond regular operational maintenance. The City has accordingly hired Arcadis to prepare design and contract documents for bidding this work for completion by a suitable Contractor. Two maintenance packages were developed by the City and this RFP covers only the scope for Maintenance Package “A”. The design of Maintenance Package “B” will be completed by others.
Maintenance Package “A” at the Hollywood WTP will consist of the following six distinct work elements:
- Lime Silo Repairs
- Replace Silo Dust Collectors
- Replace Sludge Drum Thickener and Repair Building
- Storage Tank Nos. 3 and 4 Valves Replacement
- Replace Clearwell Sample Lines
The Work is located at the following address:
City of Hollywood, Water Treatment Plant
3441 Hollywood Boulevard
Hollywood, Florida 33021
Contracting Method: Work shall be constructed under one prime contract.
Contact
| Name | Julissa Marcano |
| Email / phone | 🔒 Available with Pro Upgrade |