Turbo Blower No. 6

Agency: City of Bend Solicitation #: 27-3222 Due: 2026-11-17 5:00PM EST (in 6 days)
Open Bonfire

Summary

The project consists of furnishing, installing, and commissioning a sixth 400-horsepower dual-core APG-Neuros turbo blower in Blower Building 32B at the Bend Water Reclamation Facility. The building was originally constructed with space reserved for a sixth turbo blower as part of a planned future expansion. Since the facility was commissioned, influent loadings have increased to the point that all five existing APG-Neuros turbo blowers are periodically required to operate simultaneously to meet process air demands. With loadings expected to continue increasing over the next two years, the facility faces reduced operational redundancy and potential aeration capacity constraints. Bend City Council approved an exemption to expressly specify and require the Contractor to procure and supply an APG-Neuros brand turbo blower for this Project on October 7, 2026, pursuant to Oregon Revised Statutes 279C.345. A copy of the brand name exemption findings are available for prospective Bidder’s convenience in the Portal. The Engineer's estimate is $914,000 to $1,059,000. Detailed information regarding the services to be provided can be found in Exhibit A – Scope of Work.

Details

Solicitation Number27-3222
TypeITB
Posted2026-10-16 5:00PM EDT (25 days ago)
Response Deadline2026-11-17 5:00PM EST (in 6 days)
StateOR

Description

The project consists of furnishing, installing, and commissioning a sixth 400-horsepower dual-core APG-Neuros turbo blower in Blower Building 32B at the Bend Water Reclamation Facility. The building was originally constructed with space reserved for a sixth turbo blower as part of a planned future expansion. Since the facility was commissioned, influent loadings have increased to the point that all five existing APG-Neuros turbo blowers are periodically required to operate simultaneously to meet process air demands. With loadings expected to continue increasing over the next two years, the facility faces reduced operational redundancy and potential aeration capacity constraints. Bend City Council approved an exemption to expressly specify and require the Contractor to procure and supply an APG-Neuros brand turbo blower for this Project on October 7, 2026, pursuant to Oregon Revised Statutes 279C.345. A copy of the brand name exemption findings are available for prospective Bidder’s convenience in the Portal. The Engineer's estimate is $914,000 to $1,059,000. Detailed information regarding the services to be provided can be found in Exhibit A – Scope of Work.

Contact

Email / phone 🔒 Available with Pro Upgrade

Documents