Relocation and Reinstallation of UPS System – Rawinsonde Station, Paragon

Agency: Barbados Integrated Government Solicitation #: BMS 16-0094 - Relocation and Reinstallation of UPS System – Rawinsonde Station, Paragon Due: 2026-11-15 10:30PM EST (in 5 days)
Open Bonfire

Summary

Paragon The Barbados Meteorological Services (BMS) is inviting quotations from suitably qualified contractors for the disconnection, relocation, electrical installation, testing and preparation for commissioning of the existing Uninterruptible Power Supply (UPS) system at the BMS Rawinsonde Station, Paragon, St. Philip, Barbados. The works are to be undertaken at the site/delivery location identified below and must include all labour, supervision, materials, tools, equipment, transportation, trenching, cabling, containment, earthing and other items necessary to complete the works described in the accompanying Technical Specification.

Details

Solicitation NumberBMS 16-0094 - Relocation and Reinstallation of UPS System – Rawinsonde Station, Paragon
TypeRFQ
Posted2026-10-16 3:00PM EDT (25 days ago)
Response Deadline2026-11-15 10:30PM EST (in 5 days)
StateUS

Description

Paragon The Barbados Meteorological Services (BMS) is inviting quotations from suitably qualified contractors for the disconnection, relocation, electrical installation, testing and preparation for commissioning of the existing Uninterruptible Power Supply (UPS) system at the BMS Rawinsonde Station, Paragon, St. Philip, Barbados. The works are to be undertaken at the site/delivery location identified below and must include all labour, supervision, materials, tools, equipment, transportation, trenching, cabling, containment, earthing and other items necessary to complete the works described in the accompanying Technical Specification.

Contact

Email / phone 🔒 Available with Pro Upgrade