Relocation and Reinstallation of UPS System – Rawinsonde Station, Paragon
Summary
Paragon The Barbados Meteorological Services (BMS) is inviting quotations from suitably qualified contractors for the disconnection, relocation, electrical installation, testing and preparation for commissioning of the existing Uninterruptible Power Supply (UPS) system at the BMS Rawinsonde Station, Paragon, St. Philip, Barbados. The works are to be undertaken at the site/delivery location identified below and must include all labour, supervision, materials, tools, equipment, transportation, trenching, cabling, containment, earthing and other items necessary to complete the works described in the accompanying Technical Specification.
Details
| Solicitation Number | BMS 16-0094 - Relocation and Reinstallation of UPS System – Rawinsonde Station, Paragon |
| Type | RFQ |
| Posted | 2026-10-16 3:00PM EDT (25 days ago) |
| Response Deadline | 2026-11-15 10:30PM EST (in 5 days) |
| State | US |
Description
Paragon The Barbados Meteorological Services (BMS) is inviting quotations from suitably qualified contractors for the disconnection, relocation, electrical installation, testing and preparation for commissioning of the existing Uninterruptible Power Supply (UPS) system at the BMS Rawinsonde Station, Paragon, St. Philip, Barbados. The works are to be undertaken at the site/delivery location identified below and must include all labour, supervision, materials, tools, equipment, transportation, trenching, cabling, containment, earthing and other items necessary to complete the works described in the accompanying Technical Specification.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
📄 Request for Quotation UPS Relocation Paragon.pdf Documentation
-
📄 Technical Specification UPS Relocation Paragon.pdf Documentation