Water, Street & Drainage Improvements - W Phillipsburg Phase 2

Agency: Tift County Board Of Commissioners Solicitation #: PE-77648-NONST-2027-000000031 Due: 2026-11-17 11:00AM EST (in 6 days)
Open Gpr

Summary

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Water, Street & Drainage Improvements to serve the West Phillipsburg Community Phase 2 as shown on the construction drawings. In general, construction consists of +/- 3,600 linear feet of twenty-foot-wide urban roadway including curb and gutter, storm drainage pipe and boxes, base and asphalt, +/- 1,230 linear feet of 2-inch PVC water main replacement with the transfer of existing water services, fire hydrants, etc., and all associated measures for the complete project. Time allotted for completion of work is 180 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 194 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract.

Details

Solicitation NumberPE-77648-NONST-2027-000000031
Typegpr
Posted2026-10-16 11:23AM EDT (25 days ago)
Response Deadline2026-11-17 11:00AM EST (in 6 days)
StateGA

Description

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Water, Street & Drainage Improvements to serve the West Phillipsburg Community Phase 2 as shown on the construction drawings. In general, construction consists of +/- 3,600 linear feet of twenty-foot-wide urban roadway including curb and gutter, storm drainage pipe and boxes, base and asphalt, +/- 1,230 linear feet of 2-inch PVC water main replacement with the transfer of existing water services, fire hydrants, etc., and all associated measures for the complete project. Time allotted for completion of work is 180 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 194 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract.

Contact

NameMiriam Jordan
Email / phone 🔒 Available with Pro Upgrade