CMPD Westover EV Charger Additions
Open
Bonfire
Summary
Installation of Six New Dual Port, 80 amp, Level II EV Chargers and all required power distribution equipment as required to serve the chargers. The scope of work will include design for future chargers for a total of twelve (12) Level II Chargers. Provisions for future chargers will include space for future panel with conduit run to future chargers locations and capped off watertight. This scope also includes adding one 200 KW DC fast charger and required electrical service and equipment to feed this charger. All other equipment is existing to remain. Chargers are owner provided and contractor installed.
Details
| Solicitation Number | 269-2027-041 |
| Type | ITB |
| Posted | 2026-10-15 3:00PM EDT (25 days ago) |
| Response Deadline | 2026-11-12 2:30PM EST (in 2 days) |
| State | NC |
Description
Installation of Six New Dual Port, 80 amp, Level II EV Chargers and all required power distribution equipment as required to serve the chargers. The scope of work will include design for future chargers for a total of twelve (12) Level II Chargers. Provisions for future chargers will include space for future panel with conduit run to future chargers locations and capped off watertight. This scope also includes adding one 200 KW DC fast charger and required electrical service and equipment to feed this charger. All other equipment is existing to remain. Chargers are owner provided and contractor installed.
Contact
| Email / phone | 🔒 Available with Pro Upgrade |
Documents
-
๐ Blank Mutual NDA.pdf DocumentationNDA that must be signed and returned to gain access to the project. This is a restricted data project.